Estimator

Project Engineer, Bids & Tenders preparation, Estimator, QS and scheduler, D.L. Cervantes Construction, Medium Rise Buildings

START Date
END Date

   Duties and Responsibilities:

 

·         Assigned as team head in the preparation of bid proposals.

·         Prepare cost estimates, quantity/materials take-off, master schedule, manpower and equipment schedules, bar chart, S-Curve, Pert-CPM, manpower histogram and detailed schedule.

Estimator, Carillion Alawi LLC - Muscat - Oman, Building

START Date

v   Post contract work of Subcontractors Monthly Progress Bill.

v   Preparation and presentation of tenders and proposals

v   Receiving Client’s Inquiry / Project Requirements and Studying the BOQ s and the

          Contract Documents.

v   Taking off Quantities and preparing of variations.

Estimator, C & A Pumps, blast furnace, TATA STEEL

START Date

Became a project control engineering apprentice shortly after I left school. I am now in my 4th and final year of my apprenticeship; I was a project control engineer for Siemens VAI after I spent the first year of my apprenticeship at NETA, after a year and a half at Siemens i was made redundant and I carried on progressing within NETA, after 3 months I started at Topside but after 5 weeks I decided I couldnt fulfill my aims as an proj. engineer while being there so i left.

Estimator, Technip, Kuantan and Segamat Compressor Station Expansion Project (Malaysia), Everest Project - Map Ta Phut (Thailand), Sisi Nubi Field Development Project – Phase 1 (Indonesia), Reformers and Aromatics Complex II Project - Map Ta Phut (Thaila

START Date
END Date

Prepared the bid cost estimate by means of computing the cost of mechanical equipment (pressure vessel, tank, column, heat exchanger, air cooled heat exchanger, compressor, and pump); calculating cost of bulk items; estimating the engineering, construction, and overhead cost; and summarizing all costs in Executive Price Sheet