Construction Planner
Construction Planner, BAM International, Building Projects /Infrastructure Projects
May ’11 to till datewithBAM International (Royal BAM Group) as aPlanner
Project: Oman Botanic Garden – Phase IV at Muscat, Sultanate of Oman (Project value: $ 110 million)
Client: Diwan of Royal Court, Sultanate of Oman
Construction Planner, MACE GROUP LIMITED, New Builds/Refurbishments
Construction Planner for Main Contractor, MACE GROUP LIMITED
Progress Reporting, Planning & Scheduling with ASTA Powerproject
Construction Planner, ROYAL CONSTRUCTION COMPANY, Residential (High Rise) / Housing
June 1998 – Aug 02 ROYAL CONSTRUCTION COMPANY LTD
Business:
Role: Construction Planner
IT Packages Used: P6 Primavera
Work/Skills:
Construction Planner, Site/Services Manager, Deputy Construction Manager, Senet, Mumi
Started as Construction Planner, Promoted to Site/Services Manager and Deputy Construction Manager
Construction Planner, Sakhalin Energy Investment Co Ltd, Sakhalin2: Onshore Pipelines
Responsible for the following scope: 190km of 24"-oil and 48"-gas onshore pipelines' construction, including 12 combined block valve sites, 190 river crossings and 5 seismic fault crossings. Developing, collating and updating plans for the project, reviewing progress reports to ensure accuracy and quality. Ensuring all required document is set up to establish a proper project baseline, and monitor progress against these to the critical path.
Construction Planner, A.S.G. Scarl, Joint Venture (Aquater – Snamprogetti – Grandi Lavori Fincosit), High-speed line Milan- Bologna
Scope of work:
Designing and building new high-speed line Milan- Bologna, complying with cutting-edge technological standards, as well as being closely integrated with the existing railway network by 8 interconnections.
Construction Planner, Byrne Bros Group ltd., Mitchellson Formwork and Civil Engineering, Bath Southgate, Cabot Circus, Glos. Quays, National Maritime Museum, Newbury Parkway
I have worked in construction since graduating and have developed a solid understanding of initial works and building processes. After being involved in differing aspects, I have now built up four years experience as a planner. I have created fully resourced programmes on many well known large sites across the south west and south east and monitored progress thereafter, highlighting planned Vs actual build. The projects have primarily been reinforced concrete structures and associated groundworks.
Pagination
- Previous page
- Page 7
- Next page