Water / Utilities

Senior Planner&Scheduler, SAIPEM, SGO Water Supply (BHP)

START Date
END Date
Experience Hours (Planning & Scheduling)
2500
Experience Hours (Forensic Analysis)
200

Project Controller (planning and scheduling, progress evaluation, re-scheduling, resource analysis, performance analysis, reporting, risk analysis)

Construction Inspector, Office Engineer, Alexander Potter & Associates / Camp Dresser & McKee, City of Baltimore

START Date
END Date

I served as Office Engineer and Construction Inspector on Patapsco Wastewater Treatment Plant expansion program, worth $100 million plus.  Program consisted of expansion of wastewater treatment facilioty to 70 mgd.  Maintained field records for inspection and equipment documentation.  Inspected offsite utility contract and onsite pile-driving operations.

Senior Scheduler, ARCADIS-US, City of Baltimore, PA, York County

START Date
END Date
Experience Hours (Planning & Scheduling)
6000
Experience Hours (Cost Management)
1000
Experience Hours (Forensic Analysis)
1000

I served as Senior Scheduler for Arcadis on a Water and Wastewater contract for the City of Baltimore, MD.  Projects under this contract included $200 million plus contracts at the Patapsco Wastewater Treatment Plant and Back River Wastewater Treatment Plant, and various wastewater sewer replacement projects throughout the City.  I performed initial and update schedule reviews, including cost and resource loaded schedules.  I performed several Time Impact analyses for these projects.

Bradley Canham

First Name
Bradley
Last Name
Canham
Professional Since
Oldest experience
Years Experience
11
Telephone Number
0732397497

 •     Maintain and manage the development , implementation and execution of the scheduling process for •     Liaise with project team on the status of the project schedule activities and deliverables.

•     Ensure schedule acceptance with the necessary stakeholders.

•     Update workbook with revised schedule dates and forecast billings accordingly

•     Develop a logic driven schedule

Ozgur Colak

O
Ozgur Colak 👤 Member for 5 years 7 months
First Name
Ozgur
Last Name
Colak
Professional Since
Oldest experience
Years Experience
8
Telephone Number
+905438710140
LinkedIn Profile
https://www.linkedin.com/in/ozgur-colak/

Project Controls Lead, North West Construction, South Al Mutlaa Housing Project (Road and Infrastructure Works)

O
Ozgur Colak 👤 Member for 5 years 7 months
START Date
Experience Hours (Planning & Scheduling)
2400
Experience Hours (Cost Management)
2400
Experience Hours (Forensic Analysis)
300

• Preparation of the baseline and up to date schedules in coordination with the Client.

Moez Allahdini H

First Name
Moez
Last Name
Allahdini H
Professional Since
Oldest experience
Years Experience
7
LinkedIn Profile
https://www.linkedin.com/in/moez-allahdini-mapm-6ba9634b/
  • Expert in project planning software: Primavera P6, Asta Powerprojects, Microsoft Projects (Developing programme, cost & resource loading, critical path analysis, updating)
  • Expert in Microsoft Excel: Charts, Pivot Tables, Data Validation, Conditional Formatting, Formula Evaluation
  • Expert in Microsoft Word: Page Setup, Template Creation, Tables, Text Formatting, Text Boxes, Smart Art
  • Expert in Microsoft PowerPoint: Presentation Design, Templates, Graphs and Charts, Animation
  • Expert in VBA programming language: Developing Macros, Defining Variables and

Planner, Galliford Try (Infrastructure Division), Southern Water Waste and Water Framework AMP6

START Date

Following a successful career at AMP (Asset Management Plan) 5, I was seconded to work on Galliford Try – Southern Water Partnership (GTSWP) AMP-6 contract to deliver Water and Waste Water Treatment projects within the western half of Southern Water’s area (West Sussex, Hampshire and the Isle of Wight). Contract value: £250m.

Planner, Galliford Try (Infrastructure Division), Thames Water AMP5

START Date
END Date

GBM (Galliford Try, MWH Global and Mott MacDonald Joint Venture) was awarded two Thames Water Framework AMP-5 contracts to carry out capital works. The framework comprised over 160 projects and is worth in excess of £300m. My role involved programme and project management. The array of projects included clean water, wastewater, SCADA and SEMD works. The project sizes varied from £20k to £60m.