Water / Utilities

Cost & planning Engineer, MMJV & Water Corporation, Alkimos WWTP

START Date
END Date
Experience Hours (Planning & Scheduling)
2000
Experience Hours (Cost Management)
1000
Experience Hours (Forensic Analysis)
100

·         Worked with a multidiscipline team of contractors to deliver a much needed waste water system for the residents of Alkimos.

·         Involved in cost control for non-directs and engineering costs. Monitored project activity data for accuracy and efficiency.

·         I was also the monthly reporting Coordinator, I worked with the contractors to get accurate costings and progress information which I compiled into a report for the client.

Permanent Employment UK-South West (Region) £50,000 - £65,000 + package

Project Manager, 7 Sea Geosciences, Marine Based Geotechnical Investigations for the Proposed Dug Out Harbour

START Date
END Date

Project Manager for the geotechnical investigations contractor responsible for marine based surface and seabed studies of the proposed new dig out port.

Scheduler, Durr Mechanical Inc., Croton Water Filtration Plant- NYC DEP

START Date
Experience Hours (Planning & Scheduling)
1800
Experience Hours (Forensic Analysis)
200

HVAC Prime Scheduler,

Preparation of Resource loaded Level 3 P3 schedule

Perform Monthly Updates.

Incorporate Change Order Fragnets into Project Schedule.

Assist in preparation of Extension of Time Requests.

Assist in preparation of monthly Notifications of Delay.

 

Assistant project engineer, Growell Hr solution Pvt. Ltd and Xeam Ventures pvt ltd. on behalf of MECON LIMITED, 2.5 MTPA exansion project of SAIL-ISP ,Burnpur

START Date
Experience Hours (Planning & Scheduling)
10000
Experience Hours (Cost Management)
10000

 I am involve in the 2.5 MTPA expansion project of SAIL -ISP ,Burnpur since concept stage  to    post commissioning   and looking after the following 

Design sepuer vision.

Project planning and monitoring ,

Scheduling

Estimation of Cost

Teaming  resources and Analysis

Resouce leveling

Tracking  progress

Reporting 

 Meeting with client and contractor

Specialist Planning, Dong Ah Consortium, GREAT MAN MADE RIVER PROJECT

START Date
END Date
Experience Hours (Planning & Scheduling)
3000
Experience Hours (Cost Management)
300
Experience Hours (Forensic Analysis)
500

Specialist Planning:

Great Man Made River Project Libya.

Production of Management reports and liase with the Libyan Government as required by letter and meetings.