CAD Supervisor, DESCON Engineering Ltd., Satpara Dam Project Skardu

START Date
END Date
  • Preparation of Civil Shop Drawing for Earth Work and Concrete Structures.
  • Preparation of Contour Maps, Layout Plan, L-Sections, X-Sections etc from the survey data.
  • Preparation of Electrical/Instrumentation drawings.
  • Preparation of As-Built Drawings.
  • Plotting and scaling of drawings and sketches (to scale printing).
  • Calculation of Earth work quantities from drawings.
  • Calculation of Concrete quantities from drawings.
  • To complete the tasks and assignments given by the Section In charge and Project Manager in time and to furnish them

Senior Planner, CH2M Hill, Thames Tideway Tunnel

START Date
END Date
Experience Hours (Planning & Scheduling)
6000
Experience Hours (Cost Management)
2000
Experience Hours (Forensic Analysis)
3000

Project to build a large sewer across London, beneath the River Thames. Senior Planner for the Thames Water funded works (budget ≈£100m), successfully lead the restructuring of the planning department, and produced the strategic integrated schedule to aid interface management and manage risks through QSRA. Developed the project WBS, schedule reporting hierarchy and sitephasing plans, and was responsible for the forensic analysis of complex compensation events.

Iftikhar Awan P.Eng.

First Name
Iftikhar
Last Name
Awan P.Eng.
Professional Since
Oldest experience
Years Experience
23
Telephone Number
+995 59 5523018
LinkedIn Profile
https://www.linkedin.com/in/iftikharawan

Professional Engineer registered in the province of Alberta, Canada with Master Degree in Construction Management, Bachelor Degree in Civil Engineering and over 19 years of experience in team leadership, project planning & scheduling, project cost control, claims (EOT, Delay cost) and contract administration. Developed, maintained and analyzed schedules for large oil & gas and electric transmission infrastructure projects using critical path method (CPM). Supervised preparation of EOT and delay cost claims for a large hydropower project.

Senior Planning Engineer, Salini Impregilo, Nenskra Hydropower Project in Georgia

START Date
Experience Hours (Planning & Scheduling)
2200
Experience Hours (Forensic Analysis)
600

Lead the planning, development and coordination of project schedule for EPC US$ 615 million, 280 MW hydroelectric project involving construction of an asphalt faced rockfill dam, 15 km long headrace tunnel, 15 km long transfer tunnel, penstock, surge tank and powerhouse.

Track delay issues, analyze data and provide weekly & monthly reports to key stakeholders and the client.

Prepare delay claims and support preparation of claims by creating delay fragnets.

Project Manager, Carr & Duff Inc., Substation Rehabiliatation

T
Trevor Lyle 👤 Member for 19 years 2 months
START Date
Experience Hours (Planning & Scheduling)
2000
Experience Hours (Cost Management)
2000

Project Manager for a major electrical contractor located in the greater Philadelphia area.

Reporting to the owners of the Company, I am responsible for all project phases from initiation to close out. I am primarily based on project sites and work closely with Construction Managers and Superintendents. Projects are typically valued at multi-million (US) dollar level.

I have 30+ years in project management for many different projects and have worked at various locations including the Middle East, Africa, United Kingdom and USA.

Piping Engineer /Piping & Mechanical Estimator, AGAP Arabia Limited, SWCS Operation and Maintenance

START Date
END Date
Experience Hours (Planning & Scheduling)
200
Experience Hours (Cost Management)
100

Operation and Maintenance of Sea Water Cooling Canal Project Royal Commission for Jubail & Yanbu, project contract value 70 Million Riyals Jubail, Eastern Province, Saudi Arabia.

Work responsibility includes the Dewatering of 4 meters Diameter Underground Discharge Pipeline prior to installation of Cathodic Protection. Prepare Daily materials requirement and Coordinate withdrawals with Royal Commission.

Planning Manager, Larsen & Toubro Limited (Water Technology International Business Unit), Doha South Sewage Treatment Works; Phase 2 Expansion Project (cost more than $200 Millions)

START Date
END Date
Experience Hours (Planning & Scheduling)
3200
Experience Hours (Cost Management)
1200
Experience Hours (Forensic Analysis)
800

L&T-GALFAR Consortium were awarded with Doha South Sewage Treatment Works; Phase 2 Expansion Project undertaken by Employer Public Works Authority (alias ASHGHAL), Govt. of Qatar, to construct a new Sequence Batch Reactor (SBR Plant) to ramp up the combined secondary treatment capacity to 200 MLD (ADWF) from 90 MLD - setting up new Ultrafiltration unit for the 1st time in the Middle East region in the largest capacity to treat municipal sewage (Project Value USD 200 million)