Water / Utilities

Planning and Project Controls professional, Absun Zolal , Waste Water treatment plant

START Date
Experience Hours (Planning & Scheduling)
10000
Experience Hours (Cost Management)
2200

•Prepare Master Schedule of Project in P6 software.

•Controlling time schedule & supplier progress report.

•Coordinate for supply chain to ensure on time delivery.

•Preparation of monthly reports, corresponding and presentations.

•Prepare and maintain of PMS (Progress Measurement System) base on P6. 

•Monitor the contractor project control activities.

SENTHIL Kumar

First Name
SENTHIL
Last Name
Kumar
Professional Since
Oldest experience
Years Experience
12
Telephone Number
+91-7358413594
LinkedIn Profile
Facebook Profile
  • Excellent Working Knowledge of Industrial Projects both Local as well International
  • High Proficiency in Primavera P6 & MS Project
  • Project Life Cycle Knowledge, Design Co-ordination & Review
  • External / Internal Stake Holder Coordination
  • Earned Value Concept and Weightage Methodology
  • Man Hour & Cost / Budget Monitoring & Control
  • MIS, Vendor/Consultant Liasoning & Expediting
  • Good Team Player as well Hard working & keen interest on Knowledge enhancement
  • Knowledge on Company Health, Safety, Qual

Manager - Planning and Control, AQUA DESIGNS INDIA PVT LTD, Chennai, Integrated Water Supply Scheme - Bihar - BUIDCO

START Date

1. Over all Project Planning and Control

2. Civil Contractor Finalisation and Schedule of completion discussion

3. Project Cost

4. Vendor/Contractor works expedition and Liasoning

5. Weightage Methodology and Physical Progress Calculation and Monitoring

6. Risk Logs

7. Critical path analysis and timely alarm to stake holders

8. Contractor Performance Monitoring'

9. Resource Planning

10. Progress Reports

11. Construction Coordination

Principal Engineer Planning, VA TECH WABAG LTD, 32MLD Greater Dambulla Water Supply Scheme

START Date
END Date

Worked in VA Tech Wabag Ltd, India and Sri Lanka

Following Were major key Result Area

1. Project Scheduling and Updation & Forecast

2. Planning Package Preparation and approvals

3. Progress Reporting

4. Critical Path Analysis

5. Site Coordination

6. Management Meetings

7. Resource Planning

8. Contract Review and Profilitability Reporting

9. Progress Report Dash boards

10. Time Extenstion

Tom Cimonetti

First Name
Tom
Last Name
Cimonetti
Professional Since
Years Experience
0
Telephone Number
905-315-2968
LinkedIn Profile
https://www.linkedin.com/in/cimonettifacilitator/

I am a Senior Scheduler/Project Manager with Alberici Constructors who is currently working on a large waste water treatment project in Toronto canada.

I create and maintain resource and cost loaded schedules in Oracle PPM.

I provide schedule training to our employees as needed.

Site Engineer, CMC di Ravenna, Rehabilitation & Expansion of Nampula City Water Supply System

START Date
END Date
  • To solve the site issues and problems to insure smooth and boosted progress.
  • To make understanding with the foremen of different sites and to insure the work done is according to the specifications and drawings.
  • To deal the engineer’s inspections and to satisfy them with the works done.
  • To resolve the Engineer objections and to find solutions with them for the unforeseen problems.
  • To insure that the work done is according to the POW and within Budget.
  • To consult with the Chief Engineer for the Technical Issues and to find suitable solutions.

Cost Control, CMC di Ravenna, Rehabilitation & Expansion of Nampula City Water Supply

START Date
END Date
  • Preparing and analyzing the Monthly Manpower Analysis Report.
  • Preparing and updating the Equipment Program, Equipment Cost Analysis.
  • Preparation of the Daily, Weekly and Monthly Diesel Consumption Reports.
  • Analyzing the daily, weekly and monthly progress report relevant to Manpower and Cash flow.
  • Preparation of the Material Consumption Reports.
  • Analyzing and updating the Cash flow.
  • Ground workings for the updating budget.
  • Analyzing and preparing reports for the planned and actual costs of the project.

Quantity Surveyor, DESCON Engineering Ltd., Satpara Dam Project Skardu

START Date
END Date
  • Preparation of Contour Maps, Layout Plan, L-Sections, X-Sections etc from the survey data.
  • Preparation of Bar Bending Schedule and Reinforcement Drawings.
  • Calculation of Earth work quantities from drawings.
  • Calculation of Concrete quantities from drawings.
  • Preparation of Measurement Sheets and Monthly Statements.
  • Preparation of Interim Payment Statements (IPS) and its approval from Engineer.
  • Preparation of all kind of measurements and billing related to subcontractor’s sub-lets.
  • Visiting site frequently to get completed work statu