Assistant Planning Engineer, SEPCOIII, Samra phase IV add-on Project

START Date
Experience Hours (Planning & Scheduling)
6000

1.        Lead the L1-L3 Schedule establishment for the Project.

2.        Responsible for the project overall plan and time schedule, timely communicate with related department to update monthly.

3.        Determine the critical path of the overall schedule, and timely inform the relevant department.

Assistant Planning Engineer, SEPCOIII, Samra phase IV add-on Project

START Date
Experience Hours (Planning & Scheduling)
6000

1.        Lead the L1-L3 Schedule establishment for the Project.

2.        Responsible for the project overall plan and time schedule, timely communicate with related department to update monthly.

3.        Determine the critical path of the overall schedule, and timely inform the relevant department.

Rishi D Rks

R
Rishi D Rks 👤 Member for 9 years 3 months
First Name
Rishi
Last Name
D Rks
Professional Since
Years Experience
0
Telephone Number
+966572481984

Jr.Planning engineer at Manazel construction

Assistant / Planning Engineer, Odebrecht, New Tripoli Int. Airport, Kizomba C, Keve Naval Base, Ic32 Highway

START Date
END Date
Experience Hours (Planning & Scheduling)
12000
Experience Hours (Cost Management)
10000
Experience Hours (Forensic Analysis)
12000

Autocad Designer

Main projects include: Structural elements in reinforced concrete and steel structure, storm water and sewage drainage, infrastructure and roadways.

Vibin Ravikumar

First Name
Vibin
Last Name
Ravikumar
Professional Since
Years Experience
0
Telephone Number
+97470086501
LinkedIn Profile
www.linkedin.com/prvibin
  • Project Management
  • Product Design & Development
  • Cost Estimation
  • Team Management
  • Precision Manufacturing
  • Cost reduction and Budgeting
  • MechanicalRepair & Overhaul
  • Inventory Management
  • Engineering & Technical Services
  • Production Planning and Control
  • MRP and Material Procurement
  • P/Line Isolation & Intervention
  • Vendor Development
  • Metal Fabrication
  • Surface Preparation & Coating
  • Process Improvement & Analysis
  • Quality Assurance & Standards<

Rizwan Ahsan

First Name
Rizwan
Last Name
Ahsan
Professional Since
Oldest experience
Years Experience
22
Guild Accreditation
GPC Member
Professional Level in Planning & Scheduling
GPC Pilot Tester
Telephone Number
+965 97216678
  • Monitor and documented construction progress. Developed progress measurement system (PMS) for monitoring construction progress.

Asst. Project Engineer, Maithan Ispat Ltd, 1.5 MTPA Integrated Steel Plant

START Date
END Date
Experience Hours (Planning & Scheduling)
2250
Experience Hours (Forensic Analysis)
550

GET and worked as Project Execution Engineer at Site

Handled day to day site activities as per plan

Look after welding, structural fabrication and equipment installation at site

Budgeting monitoring sheets and Resources and cash flow histograms and curves.

Assist Project Manager in reconciling materials procured and used at site

John Peter

J
John Peter 👤 Member for 9 years 4 months
First Name
John
Last Name
Peter
Professional Since
Years Experience
0
Telephone Number
971551735651

Am John Peter working as an Inspector at SWLifting, UAE. I have completed M.E Electrical Engineering at MIET College Trichy, India. I have experience in lifting gear inspection, NDT inspection and crane inspection.