Roads / Tunnel / Bridge

1st Call Construction Pty Ltd Planner

E
Elmira Miro 👤 Member for 17 years 11 months

Responsible in Project Operational Plan preparation, Agreed Budget, Cost to complete, Planning schedule in mechanical work and civil works, Weekly Report, Daily Activity Report, Actual Accomplishment Report, Change orders, Tracking/ monitoring of project accomplishment and productivity. Cost Evaluation Report, Monthly Report, Cost Gathering and Preparation of Billing from Client, sub-con and supplier, In-charge for Billing & Collection to our client. Buyer & also Material Control In-charges.

Contracts MAnager, Al Habtoor STFA Soil Group LLC, Piling and enabling works

START Date
END Date

Worked as Contracts Manager with M/s Al Habtoor STFA Soil Group LLC – a major Piling & enabling works contractor operating in UAE.

Reporting to Operations Director and responsible for all contractual matters FIDIC based contracts – Correspondence with Client / Consultants, Claims, Variations, Valuations and Internal Control.

 

Cost & Planning Manager, CAPEV, BCV - Plaza, Museum and Offices in Caracas, Venezuela

START Date
END Date

I was Chief Cost Engineer in the construction of a Plaza, Museum and Offices in Caracas, Venezuela. This construction site covered 4 acres and included 4 underground levels and 6 floors of building. I was involved in the full range of civil construction, including structure build, pouring of 60,000 cubic meters of reinforced concrete, masonry work, painting, electrical, plumbing, and asphalt installations.

EEI Corporation Project Controls Engineer

     Preparation of Cost Variance Analysis needed for the Monthly Cost Evaluation.

     Check actual cost monitoring with the use of Access Program per project.

     Check reported production per project.

     Check project cost savings and overrun per month.

     Check and Monitor Claims and Change Orders.

     Check and review Master / Overall Schedule using Primavera Project Planner (P3) Version 3.1.

     Progress updates weekly & monthly reports, Recovery Schedule and Look-ahead schedule.