Roads / Tunnel / Bridge

Lead Scheduler, Jacobs Engineering Group, Port of Miami Tunnel

START Date
END Date
Experience Hours (Planning & Scheduling)
4000
Experience Hours (Cost Management)
1000
Experience Hours (Forensic Analysis)
500

Develop, adapt and maintain a resource-loaded schedule for the Port of Miami Tunnel – a $620 million Design-Build PPP project. The engineering design effort includes studies, reports, permitting, civil engineering, structures, architectural, and MEP components. 

Planning Engineer, Al Jaber Group, Infrastructure works- Emirati Housing Community Phase-1, Infrastructure works-Al Ain Industrial City, Shuttle Bus Link Road- Yas Island, Yas Island Infrastructure Development

START Date
END Date
Experience Hours (Planning & Scheduling)
6900

 

·         Managing Early Warnings and claims with respect to time and cost.

·         Setting up Sustained management of dedicated control of progress profiles updated CAD files, Contractors look ahead programmes.

·         Develop Master programme in Primavera P5 and P6 using EPS and WBS structure to meet project control criteria.

Richard Ovenden

First Name
Richard
Last Name
Ovenden
Professional Since
Oldest experience
Years Experience
41
Telephone Number
+44(0) 74 359 11885
LinkedIn Profile
Richard Ovenden

I have wide experience as Project Manager, Construction Manager, Project Controls Manager and various Planning roles.

I have been on several major projects world wide including - Humber Bridge; Riyadh International Airport; The Great Man Made River (Libya); Al Raha Beach Development (Abu Dhabi). Also smaller projects such as Sheffield & Hallamshire Hospital (26 stories), built in approx 1971-2, and M/Ways/Roads during the M/Way boom of the 1970's in UK. I was in charge of progress reporting on major structures for the Great Man Made River (Libya).

Construction Site Superintendent (Paving), Bechtel Co. Inc. & Enka Co. Inc. General Partners, Kosovo, Kosovo Motorway Project

B
Burak Gunes 👤 Member for 19 years 2 months
START Date
END Date
  • Directed and managed all paving operations with overall responsibilities for safety, production, maintenance, quality and other production-related activities.
  • Oversaw the production planning, staffing, and day-to-day paving operations in a cost-effective manner.
  • Prepared paving schedule and coordinated production activities to ensure production and quality of products meet specifications.
  • Worked closely with Quarry & Plants department to ensure mat