Pharmaceutical

Foster Wheeler Project Controls Manager

10 years of experience in Oil & Gas, as Project Eng, Planning Eng, Cost Eng, Project Control Coordinator.

10 years of experience as Project Control Manager in Pharmaceutical Project, Primary and Secondary Facilities, out of 10 the last 5 years only BIOTECH Project.

In the last 20 years I have executed project in :

Qatar - Oil and Gas

Dubai - Oil and Gas

Kwait - Power

Italy - Oil and Gas - Power - Infrastructures - Pharma Primary Fac.

Swizerland - Pharma Biotech.

Turkey - Pharma Secondary Fac.

Netherland - Oil and Gas

Maintenance Engineer, Custom Pharmaceuticals Ltd, Operations

START Date
END Date

Set up, maintenance, configuration, start up and finding/solving day-to-day problems of high speed blisters packaging lines, as well as pots and strip-packing lines. Also involved in the maintenance of the equipment, scheduling and working on changing parts stock, repairing, lubrication. Working with statistical failure analysis and breakdown reduction to avoid stops out of schedule. Working as well with changeover time reduction, producing a changeover sheet/procedure to reduce time. Developing SOP’s for equipment maintenance and operation.

DONATIM Civil Engineer

Project: Various Sales and marketing activities of various machinery, equipment

      and materials.



Responsibilities: (Reporting to Sales and Marketing Manager)

     Preparation of offers,

     Participating bids,

     Follow-up import formalities,

     Solving technical problems of the customers,

Project Planner, Organon, pharmaceutical compunds, Phase 2-4 clinical trials

START Date
END Date

- Support the Global Clinical Planning Office in Oss (NL), Roseland (US) and Osaka (Japan).

                                       - Assist and advise Global Clinical Development Teams and Clinical Trial Teams in order to obtain the most current global project activity status on a bi-weekly basis as well as changes to the resource loading from

Senior Planner, Foster Wheeler, DSM Zealand Project IN CHINA

F
fhy frank 👤 Member for 17 years 7 months
START Date
END Date
  • Participate in 7 projects, 5 foreign projects and 3 involved from detail design to mechanical completion.
  • The planning and scheduling methodology is a high level of proficiency for EPC project.
  • Advances planning experience for various project was referred to industrial pharmaceutics, petrochemical and chemical building etc.
  • Skill in schedule software tools by using P3~6 and Microsoft Project/Excel etc.