Oil / Gas / Power

Planning Engineer, CS Total, Semi-Submersible Drilling Rigs, Accomodation Barge, PLV Vessel

START Date
END Date
  1. WIL PIONEER SEMI-SUBMERSIBLE DRILLING RIG FOR AWILCO ASA, NORWAY
  2. WIL INNOVATOR SEMI-SUBMERSIBLE DRILLING RIG FOR AWILCO ASA, NORWAY
  3. D 90 SEMI-SUBMERSIBLE DRILLING RIG FOR SS FRIGSTAD OSLO, NORWAY
  4. SCHAHIN MILLENNIUM SEMI-SUBMERSIBLE DRILLING RIG FOR SCHAHIN PETROLEO, BRAZIL
  5. JEBSENS SELF-UNLOADING BULK CARRIER FOR JEBSENS, NORWAY
  6. ACCOMMODATION BARGE-1 FOR AFRICAN CARIBE

Loop Check Coordinator, JGC Singapore Pte , Dung Quat Refinery

START Date
END Date

Contracted as Loop Check Co-ordinator on Petrovietnam's Dung Quat Refinery project. Implemented processes for the management of Project Issues and Actions using a web-based database tool. Role as Loop Check Co-ordinator involved liaison between management teams of 5 zones in Project site. Implemented a deliverables tracking system for Loops, Devices, Plant Systems and Plant Areas.

Project Interface Coordinator, OKLNG (Shell, BG, Chevron, NNPC), OKLNG Development Project

START Date
END Date

Implemented processes for the management of Project Issues and Actions using a web-based database tool. Role as Interface Co-ordinator involved liaison in a Project Assurance capacity with all project departments. Organised a steering committee to commission the implementation of an integrated Business/Project Monitoring system. Interfacing with existing systems: Documentum, Q-pulse, Pertmaster. Implemented a functional analysis of the Projects Deliverables profile. Implemented an Issues and Actions Monitoring database.

Project Controls Lead Engineer, ATLAS INT. ENGINEERING SERV. NIGERIA LTD., Various

START Date
END Date

Contracted to implement management processes for the development and control of the Company's portfolio of Engineering Design projects. Role as manager of a project controls team of four, involved supervision of the project controls element for 27 engineering staff across 5 engineering disciplines : Process, Piping, Instrumentation, Electrical and Structural. Organised the Company's document control procedures from first principles. Introducing automation in work estimates and project status reporting using Filemaker web-based database.

Software Systems Manager, Vetco Gray, Bonga Field Development (Shell)

START Date
END Date

Contracted to implement management processes for the control of project deliverables to achieve a crucial deadline on Shell's, Bonga Project (Nigeria). System comprised Wonderware InSql, InTouch and InControl within a system of 12 networked industrial PCs and 30 paired Subsea Control Modules. 

Field Coordinator (Integrated Automation Systems - DCS, ESD, F&G, SCADA), Eni (Agip Gas), West Libyan Gas Project

START Date
END Date

Co-ordination for delivery, installation and testing of the Integrated Automation Systems (IAS) for a$500m Oil and Gas Processing Plant. IAS System comprising DCS (ABB Harmony System with Tenore MMI), SCADA (Transmitton RTU with Fastflex), and Safety Systems (ICS Trusted Systems for F&G and ESD). 



A combined systems total of 21,000 I/O among 272 cabinets distributed geographically in 6 locations within a central process plant, 47 well- head locations and 20 locations along a 500Km pipelint to Coastal processing plant.