Oil / Gas / Power
Head of Planning & Project Controls, Various, Various
I am an experienced, skillfull and innovative Project Controls professional with 18 years industry experience.
I have a proven track record of achievement across various industry sectors, including Utilities, Oil and Gas, Power Generation, Rail and Heavy Engineering.
My last two roles have been as Head of Project Controls within Utilities and Oil and Gas.
Planner, ATI - Fago - Sistemi Industriali , Drainage of the subsurface on behalf of EDIPOWER
Project: (EDIPOWER, Milazzo, Italy)
From January 2007 to August 2008 I worked as a Project Planner at the Power plant at San Filippo del Mela - Milazzo, for SISTEMI INDUSTRIALI S.r.l., engaged in the construction of plants for drainage of the subsurface on behalf of EDIPOWER.
Planner Manager, SARAS, SARAS T.A. FCC 2009 - Cagliari - Italy
Project: (SARAS, Sarroch, Italy)
SARAS T.A. FCC 2009
From October 2008 until July 2009 I was involved in the planning of the FCC and Alkylation plants stop, together with the schedule of investments for all disciplines (civil - mechanical - electrical instrumentation). After realizing three of the five level 4 subprojects, I coordinated four scheduler that every day were uploading advances in the same schedule.
I supervised of the plant stop master, a program containing 13,000 task and its resources.
Planning Manager, IREM S.P.A. - Italy, NESTE OIL - NExBTL renewable diesel plant Rotterdam - Holland
Project: (Technip - Irem, Rotterdam, Netherlands)
NESTE OIL - NExBTL renewable diesel plant Rotterdam
From July 2009 until December 2010 planner manager at the site of Neste Oil Rotterdam with IREM Spa on behalf of Technip Italy.
Planner Manager, IREM S.P.A - Italy, HELLENIC PETROLEUM S.A. - Elefsis Refinery Upgrade Project - Athens - Greece
Project: (Tecnicas Reunidas - Irem, Athens, Greece)
HELLENIC PETROLEUM S.A. - Elefsis Refinery Upgrade Project
From March 2011 planner&scheduler&progress reporter at the site with IREM Spa on behalf of Tecnicas Reunidas.
Main Tasks: preparing the schedule level of detail 4 of the mechanical construction (Piping, Equipment, Structure erection and Precommissioning) on Primavera P6. Creation of special tools in Access, Excel to load the weekly progress.
Lead Planning & Project Control Engineer, Hitachi Power Europe GmbH, Coal Fired Power Plant Convoy (Rotterdam)
EPC - Contract
Develop the basline program
Maintenance the schedule
Critical Path Analyse
Time Impact Analyse
Senior Scheduler, Tebodin, A variety of tenders and site based projects
- Proposal schedule, Detail control schedules and scheduling support for current projects
- Develop the works into a future department of Project Controls
Pagination
- Previous page
- Page 956
- Next page