Asst General Manager (Planning), Shanghai Youhua Process Technology Co.Ltd, saving-energe programming

START Date
END Date

 

Saving-energy Project of some plant of Sinopec is a large project aimed to reduce its energy consumption. Before the new plants was built, the energy consumption was satisfied, but the heat integration between the old and new plants was not so good. So by optimizing the unit plant and improving the connection among different plants, the energy consumption will be reduced.

During the process, I lead a ten-engineer member team, discussed the proposals every week with our team members.

Senior Planner, SNAMPROGETTI – Milano, Combined Cycle Power Plant, Fertilizer complex, Refinery upgrade

START Date
END Date

Main Projects:

  • ENGRO New Ammonia – Urea Plant:

TKLS Project for the construction of a fertilizer complex consisting in two plants: the first one for the production of 2,194 MTPD of Ammonia using the technology licensed by Harold Topsoe A/S and the second one for the production of 3,835 MTPD of prilled Urea using Snamprogetti S.p.A technology.

Site Planner Coordinator, Tecnimont, LDPE Polyethylene Plant

START Date
END Date

Scope of work:

Construction of a 350 kton/a Polyethylene plant in Stenungsund (Sweden). The Plant is an expansion of the existing operative plant. The scope includes ISBL and OSBL works, including silos and revamping of packaging stations, process control systems, raw materials, utility and connections at tie-in points.

Senior Planner, Tecnimont, New Propane Dehydrogenation (PDH) Plant

START Date

Scope of work:

To build a Propane Dehydrogenation (PDH) Unit with design production capacity of 510.000 MTPY of propylene based on the UOP “Oleflex” Propane Dehydrogenation technology. The scope of works consists in Detail Design, Engineering, Construction and Pre-commissioning services activities.

Pongthep Plodpluang

First Name
Pongthep
Last Name
Plodpluang
Oldest experience
Years Experience
41
Telephone Number
+60 17 6702504

Functions:

  1. Manage and control Integrated Planning, levelling resources
  2. Lead Shutdown & turnaround Planning Team
  3. Lead CMMS implementation MAXIMO/SAP 

Planning Tools

  1. Primavera; P3, P6
  2. MS Project

CMMS 

  1. Maximo
  2. SAP