Senior Planning Engineer, KBR Kellogg Brown and Root Pty Ltd, PNG LNG Upstream Project

START Date
END Date

Senior Planning Engineer on the EOS Joint Venture FEED study team. Responsible for the development of the Engineering master schedule of the project FEED phase. Development and establishment of the project baseline schedule, weekly updates and the integration of progress monitoring data for performance measurement and reporting.

Mechanical Engineer, Tianjin Electric Power Construction Company, China Huadian Guangxi Guigang 2*600MW Thermal Power Plant

G
Ganyi WANG 👤 Member for 15 years 3 months
START Date
END Date

Responsibilities:

  • Responsible for the management work of different equipments and tools used on construction site.
  • Compile lifting procedures.
  • Apply the license for lifting equipments from the local government.
  • Manage the related project documents.

Planning Engineer, Tianjin Electric Power Construction Company Nuclear Power Branch, 12/2006 - 11/2008: China Guangdong Nuclear Power Group Ling’ao Nuclear Power Plant phase 2

G
Ganyi WANG 👤 Member for 15 years 3 months
START Date
END Date

Responsibilities:

  • Establish project planning structures about EPS, OBS, RBS, WBS project activity classifying codes etc.
  • Collect necessary information which contains workflow, resource (Budget) plan, activities duration etc.
  • Set up detail construction and commissioning baseline schedule to match contract requirements.
  • Loading and leveling resource.
  • Generate the S Curves and Resource histogram.
  • Use CPM, EVM, S Curve techniques to follow up and analyze the schedule performance.
  • Reschedule and update project schedules b

Lead Planner, Alstom China - Wuhan Boiler Company Ltd., Luneng Xinjiang Hebukesaier Thermal Power Plant 2*300MW Boiler Project,Guo Dian Xi’an Weiyang Thermal Power Plant 2*350MW SC Boiler Project,Morocco SAFI 660MW SC Boiler Island Project,Ganshu Jinchang

G
Ganyi WANG 👤 Member for 15 years 3 months
START Date

Responsibilities:

  • Lead and mentor the Project Planners.
  • Support Tendering department to set up the Tendering Time Schedule.
  • Review schedule information from Engineering, Sourcing and Manufacturing departments.
  • Review the relevant departments’ Resource Plan.
  • Develop and optimize overall Project Master Time Schedule (Baseline) to meet all contract requirements which include milestone dates, payment dates and other requirements.
  • Regularly Monitor.

Alliance Planner & Scheduler, Alstom Power, Hydro-Power & Water Resources

START Date
END Date

Planning and scheduling of Poatina Power Station Modernisation & Refurb works.  Planning and scheduling for upcoming Tungatinah Modernisation Project and any other projects for the Alstom Power Division in Tasmania

Outage Planner, Indianapolis Power & Light Co, Petersburg Unit 1 and Unit 4 2010 Outages

START Date
END Date

Outage Planning for the Unit 1 and Unit 4 2010 Spring outages.  Planned work on Precipitators.  This included, writing work orders in Empac, ordering parts, working with contractors.