Planning Engineer, Wood Group, Offshore Facilities Maintenance and Upgrading, EPCIP of CPSE Water Injection Extension Phase 2 Project, EPCI of Removal of Redundant Facilities

START Date

Administered job cards in M-Power, prepared baseline (level-3 and level-4 plan, tick sheet, manning requirement, and histogram); monitored progress (P3 and m-Power update, daily / weekly report, MOM, and issue log); anticipated slippages by means of forecast; and analyzed productivity and other statistics for KPI calculation

Planning Engineer, Mustang Engineering, Alternative Bridge Landing Module (ABLM) on the North Rankin A (NRA) platform

START Date
END Date

Prepared level-3 and level-4 (deliverables level) plan by P6 c/w histograms aligned with CTRs and SDS (Supplier Documents Schedule); monitored progress; and interfaced with Transfield Worley as construction contractor

Project Control Engineer, Technip, Sisi Nubi Field Development– Phase 1, Onshore Facilities for Gendalo Field Development, Sadewa-Z WHP and Pipelines, Onshore Facilities for Gehem Field Development (Indonesia)

START Date
END Date

Established the project setup (project coordination plan, project quality plan, schedule, and budget incl. CTR – Cost, Time & Resources); monitored and rectified the implementation (recovery plan, daily / weekly / monthly report, MOM, supervising document controllers); compiled technical documents, such as Scope of Work and Basis of Design; and handled commercial matters of the project (cost report, change order, level-4 cost estimate, and invoicing)

Andreas Halim

First Name
Andreas
Last Name
Halim
Oldest experience
Years Experience
10
Telephone Number
+6738907680

Ten years of progressive advancement as Planning Engineer / Project Control with a broad knowledge on project / construction engineering, cost control, and estimating. Experienced in oil & gas industry from concept selection; Front End Engineering Design (FEED); Engineering, Procurement, and Construction (EPC); maintenance (shutdown and non-shutdown); and decommissioning. Proficient with Primavera Project Planner (P3 and P6), Microsoft Project, m-Power, and Microsoft Office

Estimator, Technip, Kuantan and Segamat Compressor Station Expansion Project (Malaysia), Everest Project - Map Ta Phut (Thailand), Sisi Nubi Field Development Project – Phase 1 (Indonesia), Reformers and Aromatics Complex II Project - Map Ta Phut (Thaila

START Date
END Date

Prepared the bid cost estimate by means of computing the cost of mechanical equipment (pressure vessel, tank, column, heat exchanger, air cooled heat exchanger, compressor, and pump); calculating cost of bulk items; estimating the engineering, construction, and overhead cost; and summarizing all costs in Executive Price Sheet