Planning & Cost Control Engineer, Kuwait Oil Tankers Co. - KOTC, LPG Filling Plant

START Date
  • Assisted in the development of the overall plan for the project including "project time schedule, high level cost estimate and Design, Engineering, Procurement & construction planning."
  • Identification of the project risks for a design and construction stages and suggest the mitigation actions required, prepare the secondary schedule & fullback plan in coordination with the project parties plans "PMC, Contractor, Legal, & financial departments"
  • Review the design guidelines & the terms of references (TOR) within the request for proposal from the consultant

Construction Engineer; Construction Coordinator; Manager of Project Controls and Purchasing; Manager of Estimating; Manager of Construction, Howe Baker Engineers, Inc., Crude Unit; Ethanol Plant; Steam Methane Reforming Hydrogen Plants, Chemical Plants

START Date
END Date

Responsible for all job site quality control including welder testing and weld mapping, progress and cost monitoring and reporting, software development, subcontract administration and document management; responsible for all heavy rigging design, preparation of corporate safety manual and construction procedures manual, estimating construction and construction coordination with job sites for both modular and stick-built projects foreign and domestic; managed procurement department and all estimating and planning and scheduling for corporation; Construction bidding, planning and management

Project Planning Engineer, Petro Energy Contracting, "Reliance Industries Limited, India",Jindal Saw Ltd., OIL & GAS ,Pipeline & Refinary,Petro Chemical projects

START Date
END Date

 

v  Developing Level I, II, III Schedule in Primavera & MS Projects.

v  Working experience of over 35,000 activities on planning software.

v  Calculating Resource requirements like manpower and Plant & Machinery requirements for the project.

v  Liquidating the Project quantitatively across the duration as per schedule.

Mark Smith

M
Mark Smith 👤 Member for 20 years 8 months
First Name
Mark
Last Name
Smith
Oldest experience
Years Experience
6
Telephone Number
+61 418194692

current / recent positions: EPCM Senior Cost and Planning functions LNG

Natural progression from the field to the office (on the tools > field engineering > project engineering > project controls site > project controls corporate)

M&M, O&G

International exposure as both Sub-Contractor and EPCM Contractor

Conversant with most Office applications as well as most planning software in construction use (current Primavera 6 ver. 7)

Currently on 4th LNG project based in Perth, Australia

Assistant Planning Engineer, Chicago Bridge and Iron (CB&I), Trans Thai Malaysia Gas Receiving Terminal

M
Mark Smith 👤 Member for 20 years 8 months
START Date
END Date

Creating a master access database for recording the progress of piping and associated activities.

  • Daily progress recording and reporting along with liaison between the office and site supervision.
  • Monitoring material deliveries and sub-contractor fabrication and progress.
  • Establishing and ensuring prioritized activities are being worked on to maximise productivity.
  • Obtaining clients’ signatures for monthly progress completed.

Senior Planner, BECHTEL, Queensland Curtis LNG Project

M
Mark Smith 👤 Member for 20 years 8 months
START Date
END Date

Development of Cost Control and Contractor reporting systems until project gained NTP.

  • As I was deployed to the site very early ahead of the LNG Tanks’ commencement I assumed roles of both cost and trends engineer in the field reporting back to Bechtel corporate in Houston, Texas.
  • Job function included tailoring subcontractor reporting formats and monitoring early works subcontractors for marine facilities, site preparation (including clearing and bulk earthworks), camp facilities and Bechtel internal direct hire scope.