PLANNING ENGINEER, Chevron , Gorgon LNG Downstream Project

START Date
END Date

 

The Greater Gorgon Area is located 200km offshore of the northwest coast of Western Australia and contains in excess of 40 trillion cubic feet of recoverable natural gas.

·         16.5m Manhours (EPC)

·         200K Tonnes overall

·         97K Tonnes of structure steel

PLANNING ENGINEER, HHI, QATAR GAS II (ONSHORE PROJECT LNG STORAGE 5 TANKS)

START Date
END Date

 

140,000 m³ the tanks have an outer diameter of 78 m and are about 40 m high. The 80 cm thick walls are horizontally post-tensioned using 19x0.62" while12 strand tendons Ø 0.62" were used for the vertical post-tensioning.

 

- Monitoring actual of progress comparing with BOQ 

- Maintain and update Project schedule

- Work variation and forecast volume 

- Project S-Curve, Milestone schedule, 3 week look ahead program

- Critical Shipment follow up and recovery plan preparation

Senior Planning Engineer, Shriram EPC, 50MW Solar power project

START Date
END Date

·         Preparing construction schedule lies with Construction team in Primavera P6 and Export into MS Project.

·         Monthly Billing accountability for Sub- Contractors.

·         Generating Daily & Monthly Reports for top management.

Planning Engineer, Powertech Engineer LLC, 132KV OHL Construction

START Date
END Date

·         Evaluating project scope, estimation of material / equipment & manpower cost.

·         Working as a Portfolio planner and reporting to General Manager – Operations.

·         Estimating capital expenditure for the project.