Oil / Gas / Power

Senior Project Planner / Maintenance Planner , CB&I, Fluor, Jacobs, EPC projects all sectors

P
Peter Roman 👤 Member for 11 years 4 months
START Date

Experience more than 20 years with Civil sector, Oil & Gas sector, Nuclear Sector.

I am flexible for the different types EPCM on shore projects of the chemical industry as Oil & Gas Industry, Refinery Process Unit, Petrochemical Facilities, Organic & Inorganic chemistry and Nuclear Power Plant.

 

As professional execute manager and senior planning engineer demonstrating strong leadership and a progressive of achievement as:

Senior Planning Engineer (contract), Jacobs; the Netherlands, 2014 – 2014

Senior Project Planner / Maintenance Planner , CB&I, Fluor, Jacobs, EPC projects all sectors

P
Peter Roman 👤 Member for 11 years 4 months
START Date

Experience more than 20 years with Civil sector, Oil & Gas sector, Nuclear Sector.

I am flexible for the different types EPCM on shore projects of the chemical industry as Oil & Gas Industry, Refinery Process Unit, Petrochemical Facilities, Organic & Inorganic chemistry and Nuclear Power Plant.

 

As professional execute manager and senior planning engineer demonstrating strong leadership and a progressive of achievement as:

Senior Planning Engineer (contract), Jacobs; the Netherlands, 2014 – 2014

lester allen manansala

First Name
lester allen
Last Name
manansala
Professional Since
Oldest experience
Years Experience
3
Telephone Number
+966500928152 +639093257016
LinkedIn Profile
https://www.linkedin.com/profile/view?id=192711213&trk=nav_responsive_tab_profile
Facebook Profile
https://www.facebook.com/engrlester

Mechanical Engineer with experienced in Manufacturing, Comissioning, Maintenance & Operation in Petrochemical, Water, Gas Industry.

Maintenance Planning preparation of scope of work, resources, duration, tools, materials and information in a Daily, Routinary, CBM, short term and long term shutdown maintenance.

SKills:

Computerized Maintenance Management System (CMMS)

-SAP Plant Maintenance, SAP Material Management

-Primmavera P3, P6, P6 web

-MS Project, PS Excel, MS Word, MS Power point, Gooogle Sketch up

Packaging Foreman, Philippine Polypropylene Inc., Logistics Operation

START Date
END Date

Packaging Foreman -Philippine Polypropylene Inc.

 (Nov.17, 2010- May 16, 2011) Pafc-Pnoc Batangas Dos Mariveles Bataan

  • Responsible for the overall operations of the packaging section with the end in view of maximizing productivity and ensuring good packaging quality.
  • Ensure packaging equipments are in good condition, available spare and raw materials.
  • Preventive Maintenance on the packaging equipments.

Planning Engineer/ SAP Specialist, Linde Philippines, SAP PM Process and Implementation, SAP PM Data gathering, upload a Testing

START Date
END Date
Experience Hours (Planning & Scheduling)
5000
Experience Hours (Cost Management)
900
Experience Hours (Forensic Analysis)
600

Maintenance Planning Engineer / SAP PM Specialist

Linde Philippines (Linde Group) Reliability- Engineering Department

January 16, 2013- January 1, 2015- KM.47 Sampaloc, Apalit Pampanga Philippines

 

 

Planning engineer, SADARA CHEMICAL Company (joint venture Saudi Aramc & Dow Chemicals, SADARA Planning Process and CMMS Implementation

START Date
Experience Hours (Planning & Scheduling)
6600
Experience Hours (Cost Management)
1000
Experience Hours (Forensic Analysis)
750

Planning Engineer. IV – SADARA Chemical Company

Joint venture of Saudi Aramco & Dow Chemicals

December 14, 2014 – Present, Dhahran Saudi Arabia

·         Ensure work requests are clearly defined, scheduled and completed.

·         Routes work requests originating within the plant to the appropriate work group or service provider.

Project Planner, Fluor, Vopak Fuel 2 Terminal Upgrade

START Date
Experience Hours (Planning & Scheduling)
2450
Experience Hours (Cost Management)
550
Experience Hours (Forensic Analysis)
750

Experience in planning and scheduling FEED and EPCM Projects. Schedule development, analysis, maintenance, monitoring, and recovery plan development activities in the field and the home office.  Preparation of basis of schedule/plan document when issuing schedules for approval.

Analyzing contractor schedule updates, and use key dates to update master schedule.

Identify project risks and early warning notification of delays effecting critical path.

Althaaf Yusuf

First Name
Althaaf
Last Name
Yusuf
Professional Since
Oldest experience
Years Experience
7
Telephone Number
+27 83 354 6123

Project Planner in the South Africa.

Proficient with Primavera 3, and primavera 6.

Proficient with Microsoft Project 2010

Ability to meet deadlines and work under pressure.

Significant planning/scheduling experience on EPCM projects.

Ability to multitask easily with strong analytical thinking and problem solving ability.

Ability to influence and work with people at different levels in the organisation. 

Project Planner, Fluor, Sapref Alliance - Multi-projects

START Date
END Date
Experience Hours (Planning & Scheduling)
1000
Experience Hours (Cost Management)
500
Experience Hours (Forensic Analysis)
500

Development of level 1, level 2 and level 3 integrated master schedule based on CAPEX.
Portfolio planning and forecasting resource requirements for future projects.
Planning and controlling of multi-disciplinary engineering related projects.
Resource loading the project schedule to generate s curves and histograms
Integration of contractors schedule into the overall project plan. Updating the project schedule and measuring it against baseline schedule. Schedule variance analysis.
Weekly progress updates and reporting of delays and deviation.
Generating reports on planned vs.