Oil / Gas / Power

Digital Communications, Profactaplan, Ongoing

START Date

I am in charge of digital communications at Profactaplan, a project controls company that specialises in project planning.

I do a lot of research on the industry and its trends. What the problems are that the different industry professionals face with regards to project controls, be it project managers, project planners, projects directors etc.

I am also part of a group that develops training in the project controls field.

My main aim is to fuel conversations in project controls, because that's where a lot of the solutions to our industry's problems will come from.

#planningengineer #claims #projectcontrols #pcglobal #planningplanet #guildofprojectcontrols #disputes #jobs #disputereolution #planning #projectplanner #construction #pcg #plan, PengLai Jutal Offshore Engineering Heavy Insustries Co., Yamal LNG MWP3 PAR

START Date
Experience Hours (Planning & Scheduling)
33600
Experience Hours (Cost Management)
800
Experience Hours (Forensic Analysis)
400

Senior Planning Engineer

1. In charge of bidding documentation submission;

2. Review Project Execution Plan and Project Planning & Progress Control Procedure;

3. Review the Level 3 schedule for bidding projects, sometimes also need to prepare Level 4 or Level 5 schedule as Clients's requirements;

4. Review utilization plan for large equipment and facilities;

5. Review and check manpower histogram

6. Update the planning documentation when new clarification issued;

#planningengineer #claims #projectcontrols #pcglobal #planningplanet #guildofprojectcontrols #disputes #jobs #disputereolution #planning #projectplanner #construction #pcg #plan, PengLai Jutal Offshore Engineering Heavy Insustries Co., Yamal LNG MWP3 PAR

START Date
Experience Hours (Planning & Scheduling)
33600
Experience Hours (Cost Management)
800
Experience Hours (Forensic Analysis)
400

Senior Planning Engineer

1. In charge of bidding documentation submission;

2. Review Project Execution Plan and Project Planning & Progress Control Procedure;

3. Review the Level 3 schedule for bidding projects, sometimes also need to prepare Level 4 or Level 5 schedule as Clients's requirements;

4. Review utilization plan for large equipment and facilities;

5. Review and check manpower histogram

6. Update the planning documentation when new clarification issued;

Mohd. Fahim

M
Mohd. Fahim 👤 Member for 5 years 6 months
First Name
Mohd.
Last Name
Fahim
Professional Since
Oldest experience
Years Experience
8
Telephone Number
+918130377142
LinkedIn Profile
https://www.linkedin.com/in/mohd-fahim-90aa7055
Facebook Profile
https://www.facebook.com/fahim.khan.73700136

Myself Mohd. Fahim, a Mechanical Engineer and MBA in Project Management, having 10 years of experience in Project Planning, Scheduling, Monitoring & Cost Control for large scale EPC Projects.

Software Skills:

 

Planning Engineer # Cost Control Engineer # Project Control # Risk Engineer, Saipem, DANGOTE FERTILIZER PROJECT

M
Mohd. Fahim 👤 Member for 5 years 6 months
START Date
Experience Hours (Planning & Scheduling)
8100
Experience Hours (Cost Management)
3000
Experience Hours (Forensic Analysis)
1000

2015 - Present               DANGOTE “FERTILIZER PROJECT”

  • Fertilizer Plant for the Production of 7,700 MTPD of Granulated Urea, (two trains with a production capacity of 3,850 metric tons each per day) in the Nigeria. The lump sum contract encompasses the engineering, procurement, and construction for a total value of approximately $1 billion.

Mainactivities:

 

Lead/Senior Planning Engineer, Petron Engineering Construction Ltd., PETROCHEMICAL COMPLEX-II

M
Mohd. Fahim 👤 Member for 5 years 6 months
START Date
END Date
Experience Hours (Planning & Scheduling)
4050
Experience Hours (Cost Management)
1800
Experience Hours (Forensic Analysis)
1200

2012 - 2014                   GAIL “PETROCHEMICAL COMPLEX-II”

  • EPC basis Erection of Cracker Furnace Package and Composite Works for Gas Cracker Unit for Petrochemical Complex – II, Gas Authority of India Limited, Uttar Pradesh, India.

Mainactivities:

PLANNING ENGINEER, kazstroy services india ltd., Guru Gobind Singh Refinery Project

M
Mohd. Fahim 👤 Member for 5 years 6 months
START Date
END Date
Experience Hours (Planning & Scheduling)
3650
Experience Hours (Cost Management)
600
Experience Hours (Forensic Analysis)
200

2008 -2010                    HMEL “Guru Gobind Singh Refinery Project”

  • CDU/VDU, DHDT & NHT/CCR Heaters Works

EPC Project with In- House Engineering and successful completion of heaters with commissioning assistance to the client.

 

Main activities:

 

Lead project planner, Petroineos, Multiple concurrent construction projects

C
Clare Laird 👤 Member for 5 years 5 months
START Date
Experience Hours (Planning & Scheduling)
7000
Experience Hours (Cost Management)
400
Experience Hours (Forensic Analysis)
1000

Supervise and guide project planning team as well as devise plans of up to 106 Projects per year from Cradle to Grave both short term projects ranging from 3-9 months and longer term projects up to 7 years.