Oil / Gas / Power

The Linde Group / Linde KCA Dresden GmBH Senior Planner

CRACKER REVAMP

Responsible for the on-site planning and scheduling of various scopes of work for a six week shutdown for the Cracker Revamp. The scopes consisted of the removal and reinstallation of furnaces, pipework, equipment, steelwork, foundations, electrical and instrumentation. Produced management graphics and progress reports.

Wellstream Planner

Buyer (March – August 2002, January 2005 – 22nd May 2006)

I sourced to pre-agreed budgets, specifications and project time-frames, to meet the project deliverables. This included material take-offs from technical drawings, complete tender-cycle including, clarifications, bid-review, and Contract/Purchase Order negotiation and placement. Materials were controlled through a 13-week forecast system manually integrated (in house MRP) with the manufacturing plan to maximise cash-flow with reduced work in progress.

Sellafields Sites Ltd Project Controls Engineer

B30 Legacy Pond is an ailing building from the 1960s that is at various stages of decommissioning. Known as the most polluted industrial building in Europe, it represents one of the world’s toughest radiological decommissioning operation engaging all levels of stakeholders. Value is in excess of £70m over the whole life-cycle. Scope includes; O&M, EPC, construction, HVAC, all levels of waste disposal routes within stringent safety practices.

TECHNIP Planner

•     To provide project schedule as per the requirement on TOR for proposal submission

•     To develop detailed project plan and schedule

•     To provide progress measurement and report on weekly basis

•     To provide updated schedule and two week look ahead on weekly basis

•     To provide forecast schedule and delay analysis

•     To attend project meeting

WorleyParsons Project Controls Engineer

•     To provide project schedule and cost & man-hour budget for proposal

•     To provide project schedule

•     To provide project WBS and deliverable register inclusive of work milestone

•     To provide progress measurement and report on weekly basis inclusive of project budget & cost

•     To provide weekly updated schedule and two week look ahead

Planning Engineer, EC Harris, Various

D
Dave Morrow 👤 Member for 21 years 11 months
START Date
END Date
  • Responsible for assisting with overseeing the production and maintenance of construction programmes for numerous projects worth up to £50M
  • Facilitating smooth operations by adhering to the Critical Path method, calculating an effective sequence of activities, linking them together using all resources to best possible effect by anticipating demands, factoring in contingencies and alternative construction methods in case of changes in scope and monitoring progress through to timely and successful project completion
  • Extensive liaison with all stakeholders, forming clear li