Oil / Gas / Power

Lead Planning Engineer, Saudi Arabian Saipem Ltd, UBTG-3 Pipeline Uthmaniyah Gas Plant

START Date
END Date

Assigned in the Head Office to assist the Project Control Manager in various ongoing projects and produce schedules for bid proposals. It is also my responsibility to collate the different progress reports of each project to produce a Department Report to be submitted to the Managing Director every month.

As the Planning Engineer of UBTG-3 Pipeline Uthmaniyah Gas Plant my responsibilities were to produce and maintain the Level 4 Schedule and assist the Project Manager to ensure that the project is on schedule and within the budgeted man-hours.

Senior Planner / Senior Planning Engineer, Acergy Singapore Pte. Ltd., Maari FPSO - Moorings & Flexible Line Installation (New Zealand)

START Date
END Date

As Senior Planning Engineer for the Asia and Middle East Region, I am responsible for the execution of progress control and monitoring of the project(s) assigned to me. I also render assistance to Tendering Department for any Planning and or Scheduling related functions. As the Senior Planning Engineer I am also required to review or make any procedures related to the Planning functions in the Asia & Middle East Region. 

Senior Planner / Senior Planning Engineer, J. Ray McDermott Asia Pacific Pte. Ltd., ESSO Kipper Turrum

START Date
END Date

As Senior Planning Engineer for the Asia Pacific Region, I am responsible for the execution of progress control and monitoring of the project(s) assigned to me. I also render assistance to Tendering Department for any Planning and or Scheduling related functions. Responsible for the Procurement and Fabrication Phase as well as pre-Planning stage for the Offshore Installation Phase of the ESSO Kipper Turrum Project 

Jacobs Engineering Uk Ltd. Principle Planner

July 03 – March 04 Reassigned to an ongoing major expansion pharmaceutical project for Novartis in Grimsby, North Lincolnshire. Assisted the project by integrating an expansion of part of the project into the main schedule. Later, assisted the on site planning team with transition schedules taking area/floor build into commissioning hand over packages. Detail down to level three with outstanding pipe to hydro test stage, instruments to loop check, and power supplies to initial run checks. Validation and commissioning was then passed to client control.

Courtaulds Engineering Planning Engineer

Working on Courtaulds Fibres Tencel SL3 Development Plant at Grimsby, Lincolnshire. Responsible to the Site Manager for co-ordinating the planning and progressing of some twenty five sub contractors of all disciplines.

Contractors range through all disciplines from civil, building, steelwork and building finishes to mechanical, piping, painting, insulation, electrical and instrumentation.

Foster Wheeler Worley Parsons (FWWP) Lead Planner

Exxon Mobile’s Singapore Parallel Train Project, responsible for a team of 3 planners looking after Interconnecting piperacks, secondary process units and Early Tankage scopes of work.

Design and Procurement taking place in FW office in reading, UK and Construction on Jurong Island, Singapore.

Co-ordinating three separate Level 3 schedules using Primavera P3 v 3.1, and Level 1 & 2 schedules utilising milestone Software. Level 3 schedule developed from FEED stage engineering documents with buy in from discipline leads and client through consultation and review.

Logic Point Ltd. for Aker Solutions Senior Planner

Working on the Design, Procurement aspects in Portsmouth and then on the Construction at BP Chemicals Saltend Plant.

Firstly on a feasability study for the replcement of the Acid restructuring Project. Project shelved after FEED study.

Moved on to Vivergo Bio-Ethanol Plant Project, also at BP Chemicals, Saltend Hull. Utilising Primavera v 5 and co-ordinating contractors schedules to fit into Master Time Line schedule. Reassigned from Portsmouth to Site from October 2008 with responsibility for updating and monitoring Contractor Site Progress and Earned Value.