AMEC Ltd Senior Planner

BNFL Magnox Reprocessing Plant, Sellafield, Cumbria.

Creating and developing Primavera P3 (Ver 3.0) programmes, ‘S’ Curves and histograms for Project work to be carried out before, during and after plant shutdowns. The projects are multi-disciplined and due to the nature of the plant processes, require specialized procedures to be observed.

Was a "Classified Worker" (expired 2006)

SAMREF Planning Engineer

Working as part of a maintenance, project and turnaround planning team. Preparing work scope documents, P3 programmes, work orders, requisitions and compiling bid packages for sub-contractor work. Using SAP to generate work orders and requisitions also reserve materials retained on stock for turnaround use. Conversion of previous turnaround project programmes from MS Project to P3 ver. 3.1. Teaching other planners how to carry out conversions and instructing them in the use of P3.

Aryasasol Lead Planner

     Preparing a package database of offsite plant.

     Preparing a database of all punches and records of all items relevant each package to sign off.

     Making the plan to sign off all punches relevant of each package based on MC Book priority.

MAPNA Lead Planner

     Preparing master WBS & schedule .

     Preparing contract schedule for each contract E, P or C and getting detail schedule based on it.

     Tracking overall schedule and compare with contractor’s tasks.

     Addressing delays and area of concerns.

     Taking the physical progress from each department and compare with the sub-contractors reports and Updating progress in P3.1.

Aryasasol Planning Engineer

     Maintaining of / tracking with Progress Measurement System (PMS).

     Preparing the overall schedule.

     Auditing the contractor proposed detail schedule to meet overall schedule.

     Preparing daily, weekly and monthly reports.

     Preparing and executing of 3 week look ahead plan and related reports and feedbacks.

MONENCO Iran (MAPNA GROUP) Planning Manager

Oil & Gas Deputy Planning & Control Department Manager



Project                     Position                    Client

     

- Esfahan Refinery Upgrading Project     Engineering Package Planning      NIOEC (Package C – Utility & Offsite)      & Control Coordinator



- South Pars – Phase 15 & 16 Project     Engineering Package Planning      POGC

                          & Control Coordinator