Mining Works

Lead Project Planner, TWP Projects, Impala 20 Shaft

S
Sean Lavery 👤 Member for 14 years 6 months
START Date

Impala Platinum No. 20 Shaft (RSA)- Full E.P.C.M. Project [Involvement: August 2007 to Present]

I was involved in all the planning of this project: compromising of the Surface common and complex infrastructure works as well as the Normal sinking of two shafts (Main and Ventilation). All development (Incline and Decline), all underground construction works as well as the changeover to an operational mine. (Reef has been hoisted from both dips).

Junior Project Planner, TWP Projects, Konkola Copper Mine No. 4 Shaft

S
Sean Lavery 👤 Member for 14 years 6 months
START Date
END Date

Konkola Copper Mine No. 4 Shaft (Zambia)– Design Project

This project consisted of the Sinking of a twin shaft next to Konkola No. 1 Shaft. The main designing revolved around mid-shaft and bottom-shaft loading. I set up the drawing office detailed schedules so as to meet construction milestones. *Record: Tallest Steel Headgear in 2009 (±80m).

Lead Project Planner, TWP Projects, Impala 18 Shaft Feasibility

S
Sean Lavery 👤 Member for 14 years 6 months
START Date
END Date

Impala Platinum No. 18 Shaft (RSA)– Bankable Feasibility Study (B.F.S) [Involvement: April 2011 to October 2011]

I was involved in setting up the B.F.S. schedule in coordinating all stakeholders involved in preparing their reports and studies. This also included the setting up of the Forecast schedule and the C.B.E. (Cost Budget Estimate) for the project. The shaft is very similar to Impala 17# however it is going to a depth of ±2km which is slightly deeper, making Impala 18# a larger mine per ton.

Junior Project Planner, TWP Projects, Impala 17 Shaft

S
Sean Lavery 👤 Member for 14 years 6 months
START Date
END Date

Impala Platinum No. 17 Shaft (RSA)- Full E.P.C.M. Project [Involvement: January 2008 to January 2009]

I was involved in the planning of the early works of the project: compromising of the Surface common and complex infrastructure works as well as the preparations for the Pre-Sinking, Slow-sinking and Normal sinking of three shafts (Main, Ventilation and Fridge). *Record: Tallest Steel Headgear in 2009 (±81m).

Lead Project Planner, TWP Projects, Wesizwe Frischgewaagd Ledig Mine and Plant

S
Sean Lavery 👤 Member for 14 years 6 months
START Date

 

Wesizwe Frischgewaagd Ledig Project Platinum (RSA) – Full E.P.C.M Project [Involvement: August 2011 to Present]

The project is very similar to Impala 20# however conventional mining will be used.  The Project is in its early work construction stages.  I have been involved in setting up the schedule, cash flow, C.B.E. and all round planner functions for the Mine.

Shahriar Parvaz

First Name
Shahriar
Last Name
Parvaz
Professional Since
Oldest experience
Years Experience
8
LinkedIn Profile
http://www.linkedin.com/pub/shahriar-parvaz/9/26/b19

More than 10 years of experience in planning and project control field at Kazakhstan , Ghana , Congo (DRC) and Iran 

Planning Manager/Senior Planner, Transfield Services Australia, OIL AND GAS VARIOUS PROJECTS (HEADOFFICE POSITION)

START Date

I have been in planning roles for the past 11 years in the construction and mining fields using Primavera. Most of the roles have been on the project management team for the client. Most of these roles have been in Western Australia.

Project Planner, GroupFive projects Ltd, Shyama Gold Project,Mali

START Date
END Date
    • Responsible for Project Planning and progress tracking.
    • Responsible for Contract Administration and Assisting Senior Project Manager and providing help to complete his work.
    • Handling Site Cash flows, Logistics, Subcontracting, HR Admin of the organization on site.
    • Responsible for maintaining good rapport with other employees.
    • Responsible for attending all the training programs organized by the organization for the intern staff.