TH Associates Planner
Current Role
Extension of Time Claims
Preparation of Work Schedules
Preparation of Monthly management reports
Evaluation of monthly progress reports, master plans
Current Role
Current Role
Current Role
Working as a planning/ control engineer in different projects in UAE
Tolent Construction.
March to July 2000, Senior Engineer,
£4 million Multi-building commercial development.
I was involved in the setting out of pile, bolt boxes and structural steel.
January to March 2000, Senior Engineer,
£750,000 college refurbishment.
I organised temporary works, brickwork and structural steel. Liased closely with structural engineer suggesting details and providing existing levels and dimensions.
June 1999 to January 2000, Senior Engineer,
£6 million cinema development and £750,000 road improvement scheme.
Balfour Beatty Construction Ltd.
Nov 2001 to Jan 2002, Sub Agent.
£10 million resurfacing of M1 motorway.
Snagging of works and addressing defects prior to the Clerk of Works.
Sept to Nov 2001, Sub Agent,
£9.5 million inner city 10-storey office block development.
Brought on to the job for the last 10weeks I ‘pushed’ the behind schedule external works and blockwork finishing them before client handover on a difficult site.
Sept 2000 to Sept 2001, Sub Agent,
£5 million Powergen call centre.