Technical Office Engineer / Planner / Scheduler / Quantity Surveyor, JULIUS BERGER NIGERIA PLC, 1.Rehabilitation, Reconstruction and Expansion of Lagos - Ibadan Dual Carriageway Section 1 (Lagos - Shagamu) 44 kilometers 2.Proposed 20 Storey Head Office De

START Date
END Date
Experience Hours (Planning & Scheduling)
2900
Experience Hours (Cost Management)
2900
  • Preparing project execution plans and construction sequence
  • Preparing and submitting to the client the weekly progress report & weekly photo
  • Do planning for new incoming projects incorporating the engineering design, procurement aspect, and construction project to create a master program schedule
  • Loading of resources - materials, labor, plant and machinery needed to carry out a construction project according to the BOQ, drawings, plans, and technical specification
  • Preparing and submitting to the Client the actual weekly man-hours with direct and indi

Gandhara Consultants Civil Engineer

Site Engineer Cum Coordinating Engineer

Duties includes the following things:     

     Coordinated with the Pakistan State Oil (PSO) Engineers of Construction Department.     

     Duties include Planning, organizing & controlling the project by appointing & deputing Engineers to different PSO sites situated in Punjab & NWFP. As a Project In-charge I was controlling more than 34 sites.     

Arabian Construction Company, ACC S.A.L Project Controls Engineer

Cost Controller & Planner (Project Controls Engineer)

Cost Control Works:     

     Using Earned Value Analysis for Cost Tracking.     

     Using BCWS, BCWP & ACWP to calculate the SV & CV     

     Calculating the SPI and CPI.     

     Preparing sub contractor logs and keeping the track of it.     

Basil Engineering Services, Lahore, Pakistan Project Controls Engineer

Performing costing and scheduling functions including budget development, performance measurement, change control, schedule development, trending, forecasting, reporting and analysis. By utilizing the following elements of Project controls:

     Using Earned Value Analysis for Cost Tracking. Integrating work scope for assigned entities into project planning & control tools.

     Utilizing project control tools and systems including Primavera P3.

Headcount Solutions Ltd Lead Planner

Design Related /Construction Planning with a multi-disciplined project management firm for 14 years before moving into manufacturing related planning which I’m still involved with currently.



Have worked across the spectrum of different engineering projects over the years such as Pharmacuetical, Healthcare, Infrastructure/Railway, Construction & for the last 2/3 years in Food Manufacturing.

Senior Planner, Group five, Civil (roads and bridges)

START Date
END Date
Experience Hours (Planning & Scheduling)
4500

Create Baseline Schedule in CCS Candy.

Develop package measurement tools.

Measure Progress.

Hi-light scope change and impact.

Manage Continuous Improvement.

Report on both Client and Director levels.