1-Employer: – DEL (Pvt.) Ltd.
Project: – Lahore Ring Road Project-P15, Nov 01, 2009 – till date.
Construction of Interchange at
Bedian Road, Lahore.
Scope of Work: –
1.4 km Dual Carriageway, Service Roads, Ramps, Loops
Bridges, Subway, Underpass, Retaining Walls, Utility Culverts,
Drains, Water Courses & other road allied works.
Project Cost:- 2.14 Billion (PKR)
SKB (pvt.) Limited Planning Engineer
2-Employer: – SKB (Pvt.) Ltd.
Project: – Rehabilitation of Shahbaz Airbase, May 01,2009 – Oct 31 ,2009
Jacobabad.
Scope of Work: –
Residential Area Contract (RAC 05),
Technical Area Contract (TAC 04).
Designation :– Planning Engineer
Job Responsibilities:-
• Estimation of Quantities/Work Scope.
• Preparation of Level-V Plan.
• Preparation of Clause-14 Schedule.
Descon Engineering Limited Planning Engineer
3-Employer: – DESCON ENGINEERING (Pvt.) Ltd.
(a) Project: – Kachhi Canal Project (KC-03) Jul 05, 2007 - Aug 31,2008
Taunsa Barrage – Kot Addu.
Scope of Work: –
Head Regulator, Divide Wall, Flared out Wall, Silt Excluder, Silt
Ejector, Rectangular Channel & Trapezoidal Section of Canal.
(b) Project: – Mangla Dam Upraising Project, Sep 01, 2008 - Apr 30,2009
Mirpur, Azad Kashmir.