How to retrieve Primavera P6 Ver8.3.2 project schedule and database Oracle XE from dead laptop

Dear all,

I having problems to retrieve all data from my dead laptop hard disk and transfer to new laptop. Lucky the hard disk still ok,

The version P6 installed in the previous laptop is P6 Ver 8.3.2 and Database using Oracle XE.

Please guide me step by step how do.

Thanks.
Aswadimanor
[email protected]

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

Adding to activity duration vs Lag

D
D Hain 👤 Member for 9 years 5 months

What is the correct or preferred way to do this and why.

Say you have a concrete activity that will require 4 days to complete and then 7 days to cure out before you can erect steel. Do you create an 11 day activity (4 days + 7 days) with relationship to the steel erection activity or do you create the 4 day activity and then add 7 days of lag from finish of concrete to start of steel erection. Thanks

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

How do you create a schedule for a project with a gap period in the project contract

Hi All, please can anyone help. I am trying to build a schedule for a 3year contract that has a lump sum limited liability contract for the first 6months. The plan is to use these first 6months to finalise and approve the design which will then be used to define the rest of the project in detail. There are bound to be budget allocation delays between these first 6 months and the rest of the project, bit the exact duration of the delay is uncertain. How do I build such a schedule intended for EVM without this break point causing reporting issues?

I hope my question is clear.

Thanks

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

Difference between Start dates in P6

Hello everyone,

I am using P6 V15.2 and would like to clarify the fundamental difference beween start dates available in P6.

1. Start

2. Actual Start

3.Anticipated Start

4.Early Start

5.Late Start

6.External Early Start

7.Planned Start

8.Remaining Early Start

It will be appreciated if anyone can explain the difference between those.

Thank you very much in advance.

Jitendrakumar Patel( PE,PMP)

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

Can you limit number of activities on a day?

Hi All

Firstly. I am a lvl 3 planner. And a new one at that. More used to reviewing contractors programmes, than building ones...

So. Question 

I am building a programme, where upon only we have a deliverable to be discussed at a weekley meeting

Problem is. We only have two meetings a week. And can only discuss so many deliverables per meeting

If I create a new calender for the meetings, can I create a 'rule' of some king. Ie. If more than 3 deliverables are forecast to the meeting, it will jump to the next one?

 

Regards

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

The Future: Planning, Monitoring and Control in 2040

Hi all,

It is 2040 and we're working on a major infrastructure project, what do we think project planning will look like? What will we do differently to today? How will we monitor progress?

I would like to know your opinions on:

  • what trends are emerging in the industry? 4D Planning, Drones, Social networking tools such as Projectplace, Lync etc? Others?
  • how will these trends effect our industry as it is now;
  • how you think the future of planning will look in 2040;

Any opinions welcome!

George

 

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts