Oracle Primavera - PM6

Description

Here's a place to discuss some Primavera Enterprise questions

Container
No

Forum Sponsor

Top Posters

James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts

Forum Sponsor

Top Posters

James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts

Schedule Filters with WBS or codes Not Transferring

Hi all,

I've made several filters within a P6 schedule to show certain WBS sections, and FOW assigned codes.

I know how to save the layout, export layout and import again to transfer filters between schedules. For some reason however, P6 doesn't want to transfer those filters that include the WBS sections or FOW assigned codes. Those parts of the filters show up blank.

Has anyone experienced this or know why P6 behaves this way? It'd be nice not to have to re-do these filters with every schedule update I import.

Thanks!

Forum Sponsor

Top Posters

James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts

Export relationships to .xlsx Excel

Hi everybody.

This is my first input to planningplanet. Sorry if it was answered in the past. I coudnt find anything about it.

 

The point is that the projects I usually hande have more than 65000 relatioships. I use P6 version 15.1 and the only export format I get is in Excel (.xls). And that kind of excel have a limitation of 65000 rows.

Is there any way to get an export on .xlsx (Excel 2010 or above) directly from P6? It's getting impossible to export all relationships at a time whe my projects reach maturity.

Thank you in advance

Forum Sponsor

Top Posters

James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts

Unable to print profile in Print preview>page setup

Dear All,

I got P6 re-installed on my system as the oracle database crashed, now i am working with SQL server. After the new installation i am not able to print profile which was earlier available in the print preview options. Please advise.

printing_problem_-_copy.jpg

Forum Sponsor

Top Posters

James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts

Is the 64 bit SDK .xls file available ?

S
Shaiju Pv 👤 Member for 10 years 7 months

The .xls SDK files downloaded from oracle support is not working in a 64 bit OS/Office.

Its giving an error to update the VB coding to 64 bit(The oracle file created in a 32 bit OS).

Is there anyone updated the codes to 64 bit ? or from where can i get the 64 bit files

 

Regards,

shaiju

Forum Sponsor

Top Posters

James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts

Forum Sponsor

Top Posters

James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts

Missing activities after restoring the copied Baseline

I have a very strange problem with many aspects,  I will illustrate it at the following points :

 

1. this problem occurs with many project not only one and at different PCs

2. When copying an Assigned baseline from inside a project from the maintain baseline window then pressing restore button,  the restored baseline is missing 95% of its activities with a corrupted WBS structure with so many empty _with no activities _WBS levels,  I can restore the original baseline with no problems after removing it from the assign window. 

Forum Sponsor

Top Posters

James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts

Loop checking in V 8.2 and 16.2

I have been previously running 8.2 using progress overide on the programme. Occasionaly I have inadvertantly added logic that created a loop that was detected and removed from the programme. Otherwise the scheduling wont run.

This month we upgraded to 16.2 and following a normal monthly update and re-plan and many scheduling runs I ran a sched log that detected 28 loops that weren't flagged when running the scheduling.

Forum Sponsor

Top Posters

James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts

summary bar label

J
Jason LI 👤 Member for 18 years 5 months

All,

I'm organizing the layout using activity code, all the activity names are using English, and at the right side of the bar, I'm showing the bar label use another language to translate the activity names, so the people didn't know English can read the schedule.

My Question is: are there any way to showing the same for the summary bar (the summary bar label only can show the description of the activity code, but i don't want the activity code description be bilingual)

Thanks for your reply.







 

Forum Sponsor

Top Posters

James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts