Airport runway strengthening

Hi, I am currently involved in an expression of interest for a regional aerodrome upgrade. I don't have any airport project exprience but I have done a lot of road jobs.

One of the scope of works is to strengthen the existing runway from PCN 18 to PCN 38. May I know how this is carried out usually on a live runway?

Thank you

Prab

Forum Sponsor

Top Posters

Soheil Barekat
4 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts

Manpower Estimation for Airport Projects

greetings to all,

I'm working in the New K.A.I Airport Project in Jeddah-KSA. I'm trying to estimate manpower needed to deliver the project on time. The project is a Lumpsum design-build project, thus unfotunately I don't have drawings nor detailed BOQ. The only technique can be used here is analogue estimation (by cost or Area) and expert judjement.

Forum Sponsor

Top Posters

Soheil Barekat
4 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts

Forum Sponsor

Top Posters

Soheil Barekat
4 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts

Forum Sponsor

Top Posters

Soheil Barekat
4 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts