Engineer, Faber Maunsell AECOM, Docklands Light Railway (DLR), Beckton Depot Southern Expansion
Design Team Member for preparation of Design and Build Invitation to Tender documents for the depots expansion onto previously contaminated land.
R
Design Team Member for preparation of Design and Build Invitation to Tender documents for the depots expansion onto previously contaminated land.
R
Design management/ co-ordination and design (preliminary, detailed and construction) of conversion of Oldham to Rochdale Line heavy rail stations to modular tram stops, responsible for:
Operational and maintenance cost model for Contractor bidding for 36 year concession (€92m).
Feasibility study for how step free access could be achieved at 35 stations spread over London, managed by six Train Operating Companies (TOCs). The work was commissioned to inform station prioritisation for funding from the Department for Transport (DfT).
Design Team Member for Form A production and advice to Thames Water on the submission of approval documents to Network Rail for repairs to a brick sewer passing beneath Banbury Station. Options considered included a pre-fabricated replacement section and re-lining of the existing sewer.
Production of Base Data Packages for CTP Designers to produce cooling solutions for 40 stations on the Northern, Jubilee and Victoria Lines.
AECOM Deputy Project Manager for secondment of construction supervision staff. Responsibilities included maintenance of the projects electronic Project Management Plan and financial system.
AECOM Deputy Project Manager for production of deemed planning permission drawings for Transport and Works Order submission. Responsibilities include project quality management, setting up electronic data management system and monitoring production progress.
Lineside inspection of existing steel bridges for Kier Rail on TAH2 line in Walthamstow, to assess repair, strengthening and maintenance requirements as part of the 5 year framework agreement.
Production of a Bill of Quantities for a cycle bridge over the River Elwy; the design was for an RC 42m span bridge founded on bored piles.