Faber Maunsell AECOM

Senior Engineer, Faber Maunsell AECOM, Manchester Metrolink Phase 3 - Tram Stop Design & Design Management

START Date
END Date

Design management/ co-ordination and design (preliminary, detailed and construction) of conversion of Oldham to Rochdale Line heavy rail stations to modular tram stops, responsible for:


Senior Engineer, Faber Maunsell AECOM, TfL London Rail, Step Free Access at 35 Stations Feasibility Study

START Date
END Date

Feasibility study for how step free access could be achieved at 35 stations spread over London, managed by six Train Operating Companies (TOCs). The work was commissioned to inform station prioritisation for funding from the Department for Transport (DfT).

Senior Engineer, Faber Maunsell AECOM, Thames Water, Banbury Station Under Track Sewer Crossing Strengthening

START Date
END Date

Design Team Member for Form A production and advice to Thames Water on the submission of approval documents to Network Rail for repairs to a brick sewer passing beneath Banbury Station. Options considered included a pre-fabricated replacement section and re-lining of the existing sewer.

Engineer (Assistant Project Manager), Faber Maunsell AECOM, London Underground, Cooling the Tube Programme (CTP), Base Data Collection Project

START Date
END Date

Production of Base Data Packages for CTP Designers to produce cooling solutions for 40 stations on the Northern, Jubilee and Victoria Lines.

Engineer, Faber Maunsell AECOM, DLR, Beckton Depot, Southern Expansion - Project Management of Construction Supervision Contract

START Date
END Date

AECOM Deputy Project Manager for secondment of construction supervision staff. Responsibilities included maintenance of the projects electronic Project Management Plan and financial system.

Engineer, Faber Maunsell AECOM, TfL, Major Projects Business Unit (MPBU), West London Tram - Planning Drawings

START Date
END Date

AECOM Deputy Project Manager for production of deemed planning permission drawings for Transport and Works Order submission. Responsibilities include project quality management, setting up electronic data management system and monitoring production progress.

Engineer, Faber Maunsell AECOM, Kier Rail, Network Rail South East Territory, Civils Framework Agreement - Rail Bridge Inspections in Walthamstow

START Date
END Date

Lineside inspection of existing steel bridges for Kier Rail on TAH2 line in Walthamstow, to assess repair, strengthening and maintenance requirements as part of the 5 year framework agreement.

Engineer, Faber Maunsell AECOM, Denbighshire County Council, St Asaph Cycle Bridge - Bill of Quantities

START Date
END Date

Production of a Bill of Quantities for a cycle bridge over the River Elwy; the design was for an RC 42m span bridge founded on bored piles.