Judy Phil Malic
COSTENGINEER
EEI Corporation
COSTENGINEER
v Responsible prepares preliminary Primavera schedule based on the project work breakdown structure, activity duration , work sequence, resources allocation and productivity parameters.
v Responsible to optimize and finalize Primavera Schedule in close coordination with Project Management Team (PMT)
v Responsible in verifying and collates daily activity / quantity tracking and resources usage and updates Primavera schedule.
Manages & controls all commercial aspects of the project from construction schedule, cost, and procurement of materials.
Completed the Civil, Structural and Architectural documents, drawings and methodologies submission in a timely manner. Acts as interface coordinator and provided every assistance to the Contracts, Project Control, Procurement, Quality Assurance and Quality Control, and Operations Group.