Senior Planner, Costain, Glen Eyre KLM, Southampton; Project Diamond, Didcot

START Date
END Date

Planner / Coordinator – Glen Eyre KLM, Southampton (traditional contract with CDPs):

Appointed to plan the £16m refurbishment and extensions to three 3-storey student accommodation buildings. Each had a steel framed single storey roof extension to provide a further floor of accommodation, and a concrete frame / blockwork and PC floor constructed 4-storey extension to the front.

The role involved the planning and monitoring of the design, procurement and construction processes from site start onwards.

Junior Planner, Costain, Berkeley Nuclear Power Station Decommissioning

START Date

Position: Planning Engineer with Costain on their nuclear decommissioning framework at Berkeley Power Station. 

 

The framework objective is to help Magnox put the decommissioned nuclear power station at Berkeley into ‘Care & Maintenance’.  To achieve this they are in the process of extracting all remaining ‘intermediate level waste’ and processing it ready for disposal at a geological disposal facility.  The framework contract is based on the NEC model.  My role as the site planner is fourfold:

Planning Manager, Costain, Port Ghalib - Marsa Alam Egypt

START Date
END Date

Working on the Multi million dollar new development of Port Ghalib a new Red Sea Resort Town and Marina in Egypt.

In charge of all aspect of the planning for the Construction work of a $250 millions 3 Hotels [385rooms], 3 swimming Pools, 70,000 m2 Sea water Lagoon, a 2nd Phase Marina Development, Retail Souq and a Corniche.

Project Planner, Costain, M25 Holmesdale Tunnel

START Date
END Date

I was working as part of the construction site team in M25 Holmesdale Project, Enfield. The project is to refurbish tunnel structure on M25 junction 25, Holmesdale Tunnel. The scheme includes ground works, piling, demolition, construction of reinforced concrete walls and deck, and mechanical and electrical installation.