Costain

Costain

Senior Planner, Costain, Area 7 MAC Highways Project

START Date
END Date

The key responsibilities are the management of the IMP (Integrated Management Plan) including derived reports and performance indicators from P6 and TILOS. Revision and restructuring of the IMP reports to achieve a greater acceptance/integration of the Planning function within the MAC environment.

Assistant Planner or Planning Engineer, Costain, Thameslink - London Bridge Station Redevelopment

START Date
Experience Hours (Planning & Scheduling)
2000
Experience Hours (Cost Management)
500
Experience Hours (Forensic Analysis)
500

2013 – 2015 Current works – Costain - London Bridge Station Revelopment (as part of the Thames link programme worth £6.5 Billion):
I currently work for Costain at London Bridge Station Redevelopment, since working here I have experienced planning for civil works undertaken by Costain (otherwise known as self-delivery works) and Early works such as demolition, piling and drainage (which have been part self-delivery and part subcontracted).
I do both short term and long term planning.

Rebecca Keegan

First Name
Rebecca
Last Name
Keegan
Professional Since
Oldest experience
Years Experience
2
Telephone Number
07876684166
LinkedIn Profile
https://uk.linkedin.com/pub/rebecca-keegan/5a/a89/779

An Achievement focused individual able to work under pressure. Professionally presented with a flexible yet methodical approach and a positive, proactive attitude to create a robust outcome with confidence. Adaptable to different industry requirements with a flexible schedule.

- Successfully completed Primavera P6 professional fundamentals Training at Oracle University.

Assistant Planner or Planning Engineer, Costain, Thameslink - London Bridge Station Redevelopment

START Date
Experience Hours (Planning & Scheduling)
2000
Experience Hours (Cost Management)
500
Experience Hours (Forensic Analysis)
500

2013 – 2015 Current works – Costain - London Bridge Station Revelopment (as part of the Thames link programme worth £6.5 Billion):
I currently work for Costain at London Bridge Station Redevelopment, since working here I have experienced planning for civil works undertaken by Costain (otherwise known as self-delivery works) and Early works such as demolition, piling and drainage (which have been part self-delivery and part subcontracted).
I do both short term and long term planning.

Senior Planner/ Planning Engineer, Vinci, Costain, Nottingham Tram Phase 2, National Grid London Cable Tunnels, Highways Agency MAC 7

START Date
END Date

Vinci Construction (UK)                                                                                     

Senior Planner/ Planning Engineer, Vinci, Costain, Nottingham Tram Phase 2, National Grid London Cable Tunnels, Highways Agency MAC 7

START Date
END Date

Vinci Construction (UK)