Summary of Qualification: Project Control Staff in an Oil & Gas and Petrochemical Construction Industry. Develop and perform schedule update using Primavera Project Planner (P6/P3). Prepare planned S-curves, bar chart schedules. Set -up databases for calculating and tracking physical / earned progress in (Civil, Structural, Mechanical, Piping, E&I, etc.) and invoicing formats in compliance with client’s requirements and contract provision.
With more than 4 years experience in the field of drafting and modeling (primitive and surfacing) using UNIGRAPHICS (UG) NX3. Design proficiencies includes, 3D solid modeling, advance 3D surface design. Has strong desire to succeed, motivated, enthusiastic,quick to accept and adapt to new responsibilities.
Employment History: (From Present to Past)
Total years:
ØAbroad : < 3 years (Kingdom of Saudi Arabia) - (Oil & Gas and Petrochemical Construction)
0.80 year (Algeria, North Africa) - (Oil & Gas Construction)
ØLocal : < 4 years (Cebu, Philippines) - (Design, Engineering Support & Manufacturing)
Date of Employment
Job Title
Employer
Project
Country
October 12, 2011
To
August 10, 2012
Project Scheduler
Samsung Engineering Company Limited - Algeria
Sonatrach - Skikda Refinery Rehabilitation and Adaptation Project
Skikda, Algeria
August 16, 2010
To
August 16, 2011
Planner / Cost Controller
Bonatti SpA – KSA Branch
Saudi Aramco - Upgrade Flare System in Uthmaniyah & Shedgum Gas Plant
Hofuf, Kingdom of Saudi Arabia
July 10, 2009
To
July 10, 2010
Planner / Cost Controller
Bonatti SpA – KSA Branch
Saudi Aramco – Upgrade / Replace Sales Gas Compressor Motor in UGP & SGP Gas Plant
Hofuf, Kingdom of Saudi Arabia
February 23, 2008
To
May 04, 2009
Project Controls Engineer - IV
Mohammad Al Mojil Group (MMG)
Fluor Arabia Ltd. – Saudi Kayan Petrochemical Complex (Interconnecting Piperack)
Jubail Industrial City II, Kingdom of Saudi Arabia
July 12, 2004
To
February 19, 2008
Associate Engineer
LEAR Corporation – Philippine Engineering Technological Center
Design Automotive Interiors, Seating System
(UNIGRAPHICS Section – General Motors Customer Group)
MEPZ-2, Basak Lapu-lapu City, Cebu, Philippines
January 12, 2004
To
July 12, 2004
Cadet Engineer
LEAR Corporation – Philippine Engineering Technological Center
Design Automotive Interiors, Seating System
(UNIGRAPHICS Section – General Motors Customer Group)
MEPZ-2, Basak Lapu-lapu City, Cebu, Philippines
April 14, 2003
To
June 12, 2003
On-The-Job Training (320 Hrs.)
Taiheiyo Cement Philippines, Inc.
Engineering and Mechanical Maintenance Division
South Poblacion, San Fernando Cebu, Philippines
June 26, 2001
To
March 05, 2002
Groundman
Cebu Power Exponent Services Inc.
VECO Line Construction Maintenance Contractor
Pleasant Homes, Don Bosco Village, Labangon Cebu City, Philippines
Position Key Functions:
Samsung Engineering Company Limited (SECL), Algeria
Skikda Refinery Rehabilitation and Adaptation Project
Ø Develop and update a resource loaded Primavera (P6/P3) Project Schedule of Samsung Engineering Algeria work scope utilizing an approved Work Breakdown Structure (WBS) from the project lead office in Seoul, Korea
Ø Prepare the weekly/ monthly target based on approved baseline and updated level 5 schedule.
Ø Performed earned value calculations for productivity and production trend analysis to verify production levels meet or exceed expectations and to ensure schedule is compliant with contractual milestone
Ø Perform continuous schedule updating & review to ensure milestone achievement and timely project completion. Run tabular & graphical reports. Fix & re-logic out-of sequence activities.
Ø Coordinate with discipline leads on progress updates & priorities.
Ø Monitor and analyze progress as a means to identify activities that are critical and in priority.
Ø Revise or re-baseline the Master Project Schedule showing corrected resources according to change order, budget shifts or deviation which includes changes in scope due to distinct method of execution or for any reasons.
Ø Identify the necessary work schedule to be completed by the Subcontractor.
Ø Prepare progress monitoring system including a progress tracking.
Ø Prepare and consolidate all Sub-contractor daily work report.
Ø Prepare ten (10) day rapport decadaire and monthly construction progress report.
Bonatti S.p.A. Saudi Arabia
Upgrade Flare System at Uthmaniyah and Shedgum Gas Plant
Upgrade/Replace Sales Gas Compressor Motor in Uthmaniyah and Shedgum Gas Plant
Ø Develop and update a resource loaded Primavera (P3) Project Schedule
Ø Prepare & update planned progress S- curve & quantity curve by overall project, area, system or discipline where required. Run tabular & graphical reports.
Ø Execute Project progress measurement in accordance with company procedures.
Ø Prepare the weekly target based on approved baseline and updated level 5 schedule.
Ø Perform continuous schedule updating & review to ensure milestone achievement and timely project completion. Fix & re-logic out-of sequence activities.
Ø Prepare & update planned progress S- curve by overall project, area, system or discipline where required.
Ø Update resource schedules, resource costing.
Ø Create and linked excel database as per contract for easy and real-time update of progress report. Maintain, organize and update datasheets of resources.
Ø Prepare & consolidate weekly progress status reports.
Ø Perform monthly progress invoice to proponent / client.
Ø Prepare Manpower/Man-hour & Saudization reports.
Ø Check sub-contractor progress / service invoices; evaluate unit rates used as per PO/Contract and understand all project costs including material, personnel, and equipment cost.
Ø Participate in project review meetings & constant communication with the client (Saudi Aramco).
Ø Preparation of reports as required by PMT’s, or project controls-related reports as instructed or required by client.
Mohammad Al-Mojil Group (MMG)
SAUDI KAYANPetrochemical Complex K022- FLUOR Arabia Limited
Ø Produce and maintain project plans, including S-curves, histograms, etc.
Ø Performs detailed planning/scheduling activities for compliance to contract requirements and internal execution requirements
Ø Perform continuous schedule updating & review to ensure milestone achievement and timely project completion. Fix & re-logic out-of sequence activities.
Ø Investigate areas where project progress deviate from the approved master schedule.
Ø Consolidate weekly overall progress computations for Site Management report
Ø Update resource schedules, resource costing.
Ø Perform periodic reconciliation of IFC quantities with Engineering.
Ø Track; verify work quantity accomplishment for mechanical piping, insulation and painting. Generate and update quantity database. Linked excel database for easy and real-time update of progress report.
Ø Mark-up completed works in approved for construction drawings & maintain organize filing system.
Ø Prepare & consolidate weekly pre-fabrication piping painting reports.
Ø Prepare weekly overall progress computation for Mechanical Piping, Structural Erection, Civil/Concrete, and Electrical works.
Ø Manpower & Equipment Schedule (Projection & Histogram).
Ø Preparation of reports as required by Project Controls Procedure, or project controls-related reports as instructed or required by client, PMT’s
Lear Corporation (Philippine Engineering and Technology Center)
Seating and Interior Systems Department - (UG) General Motors Customer Group
Ø Design and create seating’s and interiors of General Motors through UNIGRAPHICS NX3 (Advance Modeling and Surfacing Application)
Ø Develop specifications and procedures.
Ø Communicate issues and concerns to internal/external customers and suppliers.
Ø Study/research and benchmark best practices towards product improvement.
Ø Make proposals to improve processes and operations.
Ø Supports the implementation and maintenance of quality management system and ensures customer satisfaction and continual improvement through active participation in Quality System (QS) and Six Sigma activities.
Ø Makes 11 x 17 drawing formats for components/assemblies
Ø Performs light modeling jobs and designs on different Lear GM programs using UNIGRAPHICS software
Ø Design, detail changes and study which includes updating A and B side surface of Seat Cushion and Back Foam with the hybrid assembly structures
Taiheiyo Cement Philippines, Inc.
Engineering and Mechanical Maintenance Division
Ø Assist mechanic in preventive and corrective maintenance, repair and inspection. Removal and replacement (packing seal, oil and mechanical seal for accessory gear box-transmission / motor reducers, oil cycle pumps, water cooler pumps, ram cylinders (ball mill) and support bearings and rollers)
Ø Conduct functional check
Ø Drafting pulled-out parts for the machinist using Auto-Cad 2003