Mai t. C.V. as of 31st March 2011 Lead sr. planning Engineer AND TIME IMPACTANALYSER (PPC/CA)
PERSONAL DATA
Full Name : Mai Toufeq Hassan
Mobile Phone : +971-50 7648889.
E-mail Address : [email protected],
Date of Birth : 09thDecember 1977
Academic Qualifications : B.Sc. of Civil Engineering, Specialist of Construction Management Administration
College : Tishreen University - Syria
Full Time Courses : 5 Years+2 Year Specialist in construction management
Membership : Syrian Engineers’ Guild (Lattakia)
AACE International Constituent, (USA)
International Chartered Institute for Arbitrators CIArb, (UK)
PROFESSIONAL PROFILE SUMMARY
I have 10 years of experience in the planning of project Construction ranged in value up to 800 million Dhs and Extensive Experience in scheduling, controlling, reporting and following up & Construction, Design claim assessment and advising, in Industrial, luxurious building, Infrastructure Projects and multi-function projects.
I had involvement beside FIDIC Contract, NEC Contracts and JCT Contracts.
Recently I have add to my professional experience a new tool of controlling the time in the project // Project Risk Analysis// by Using Oracle Software to prepare the risk register and mitigate the project plan and make fair compare between the pre-mitigation and post-mitigation scenarios and update the approved plan accordingly and upon approval .
Further to the above I able to deliver and provide the following main lines:
1. Develop the work means and methods using estimated (Most likely) durations based on estimated resources.
2. Develop a network of activities and identifying a critical path.
3. Submit as schedule identifying the project plan.
4. Record the work activity status/progress and any schedule modifications based on changes to the plan or mitigations.
5. Prosecute the work even in spite of any unresolved disputes.a. Explain the difference between scope and non-scope changes.
6. Discuss the concept of schedule changes and schedule change management in respect to contract agreements.
7. Describe the difference between changes and claims (for scope, compensation, relief, damages, delay, or other disagreements).
8. Describe major reasons for contract changes including the role of project scope definition.
9. Describe various types of schedule delay in respect to contract changes and claims (excusable, non-excusable, compensatory, and concurrent).
10. Describe the potential effects of disputes on project performance.
11. Drafting and assessing the different claims whether are construction claims or design claims along with impacted bars time and cost as a full analyzing based on the international standards and protocols and in respect to contracts’ needs.
PROFESSIONAL PROFILE
Company : ARCAN PROJECT MANAGEMENT SERVICES – Dubai – Abu Dhabi – UAE, other Branch Damascus - Syria
Joining Date : Dec. 2006 – April 2011
Position : Senior Project Control Engineer and Claim Assessor - PCSD
MAJOR PROJECTS:
- 3B+G+45 Floor Multi-functions Bldg. with Podiums at DIC- Dubai @ Plot No. B-001-011 for Ali & Sons Co. L.L.C.
- Construction of “Royale Residence I” 2B+G+14 Floors Res. & Comm. Bldg. on Plot No. R9-12 at Dubai Sport City, Dubai.
- Construction of “Royale Residence II”2B+G+13 Floors Res. & Comm. Bldg. on Plot No. R9-13 at Dubai Sport City, Dubai.
- Corp. Executive Hotel / Offices Bldg. 5B+LG+G+3M+26 at Business Bay Plot No. BB.B01.036, Dubai, UAE for Reef Real Estate Co. LLC Dubai.
- Mina Al Fajer Resort in Fujairah.
- BaynoonahBusiness Towers 2B + G + 4P + 23 Floors + Roof at Jumeirah Village South on Plot No JVC 17 TCP 006, Dubai.
- Tower at Plot No. 01 in Jumeirah Lake Tower.
- Guest House Hotel (7 Stars) Tripoli, Libya.
- AMWAY GATEWAY, Kingdome of Bahrain.
- Porsche Showrooms and Services Center, Abu Dhabi, UAE.
- Audi Showrooms (design and execution), Dubai, UAE.
- 6 Exhibitions for Sharjah Art Foundation.
RESPONSIBILITIES:
- Develop and check detailed schedule for Design, Engineering, Procurement, and Construction Phases.
- Interrogate inter-discipline schedule requirements and restraints to ensure logical work sequences across all disciplines of the project.
- Running Risk Analysis by applying duration uncertainly method, or probabilistic branches.
- identify the risk register and make mitigation plan, post & pre mitigation plans.
- issuing report of risk analysis beside other distribution graph.
- Build up impacted bar.
- Update and check of Time schedule indicating Target Planned vs. Current Progress.
- Establish daily, weekly, and monthly reports.
- Supports project organizational and administrative activities.
- Supervise the development & integrate of individual schedules into the total project plan.
- Establish the milestones for the total project.
- Supervise schedule resource loading and leveling.
- Support development of scheduling standards and procedures.
- Coordinate the plan formulation across the phase.
- Develop the two-week look-ahead schedule for the project.
- Prepare Monthly progress reports to the Client.
- Prepare in conjunction with project P.M. the Monthly Project Status Report.
- Prepare monthly Cash Flow Histogram and "S" Curves for Costing
- Develop forecast "Cash-In and Cash-out" until Completion of Project.
- Prepare Current Progress Histogram and "S" Curves vs. Target Planed.
- Monitor of man-power & equipment productivities rates.
- Prepare Cost Codes List.
- Prepare Budget & Costing Reports.
- Prepare Interim Payment Certificates to the Client.
- Claims/Variation Orders resolution and evaluation.
- Prepare presentations to be display in front of the involved parties to settle the final determination.
- Prepare MEP programme, start by Authority Matrix, Submittals Procedures, Engineering Work, Fixing Phase, and Testing Commissioning Phase.
- Producing Risk Analysis plan (Primavera risk analysis)
2005- 2006- HENNESSEY General Contracting L.L.C (Dubai. UAE)
Senior Planning Engineer:
Job Description:
- Issue project work plan by Using Primavera in accordion with bills of quantities documents and work needs and project manager work plan
- Prepare Cash Flow.
- Prepare Progress Charts
- Prepare Man-Power Histogram
- Prepare Procurement Sheets
- Prepare Weekly Reports
- Prepare Monthly Reports
- Updating work plan & cash flow with progress photographs
- Prepare tender plans
Major Projects:
Show villas @ Arabian Ranches (Construction, External, & Internal Finishing, Garden& Swimming Pools plus Boundary Walls
SAFINA Project @ International DubaiDry Docks
Accommodation Block (Staff Accommodation Le Meridian, Workers Camps in Jebel Ali)
Restaurants (Fibber Magee s @ Green Community
2003- 2005, Union Properties (UP) P.J.S.C. Design & Fit-out Division (Dubai, U.A.E.)
Planning Engineer:
Job Description:
Prepare fit out works plans
Put manufacturing plans with delivery dates and resources usage
Prepare the daily report / Weekly Report for Consultant checking
Follow up the work plan with the project engineer
Analyze factory and working capacity for the past & coming months
Updated the programs and finalized the actual % completed against the planned
Major Projects:
Green Community Marriott Court Yard (Full package)
Green Community Terraces and garden apartments (Joinery works)
DubaiAuto-dorm Marketing & Management Building Racing SchoolFit out Package
Up Town Midriff (Joinery Works Package)
Bugatti Show Room (fit out package)
Rimal ROTANA Suit (Fit out package & MEP works)
Arbift Bank Abu Dhabi branch
ArbiftBank Dubai Tower
Commercial Bank Abu Dhabi
2001-2003- Master Construction (Dubai, U.A.E.):
Quantity Surveyor:
Job Description:
Take out the quantity of all construction & finishing items
Prepare bills of quantity
Float and follow up enquires and tender for quantities from sub-contractor
Prepare work plan for medium works
2001- Statistic & Planning Department, The General Port –Syria Co.(Syria
Manpower Department Head:
Prepare weekly & monthly reports
Analyze of the usage resources for sea port
Issue /reply the incoming correspondences.
FREE Lancing PROFESSIONAL EXPERIENCE
Major Projects:
- 150 villas project @ Abu Dhabi, is owned by Internal Ministry of Abu Dhabi Government (2009-2010).
- 4 infrastructure projects @ Abu Dhabi, is owned by ADNOC, Abu Dhabi National Oil Company (2010).
DETAILS OF TRAINING
Training Course Subject : Primavera Projects Planner (P6)
Place of Course : Certified by Road Engineering Society, Dubai, and UAE.
Training Course Subject : FIDIC (International Federation of Consulting Engineers)
Place of Course : Certified by Engineering Society, Dubai, and UAE.
Training Course Subject : Construction Claims, Disputes & Arbitrations
Place of Course : Certified by Engineering Society, Dubai, and UAE.
Training Course Subject : Primavera Projects Planner (P3)
Place of Course : Certified by Engineering Lattakia society, Syria
COMPUTER SKILLS
- Primavera (Oracle P6.2) & (P3.1)
- Office XP (Excel – Word – Power Point)
- Primavera (P3e/c) Enter price (P5)
- Access 2003
- Adobe Photoshop
- MS Project
- Auto CAD 2005
- Oracle(Primavera Risk Analysis).
OTHERS
- I am proceeding with registration in UAE courts as a Legal Reporter in construction claims, my application under processing, expecting to finish and obtained me legally within two months.
- My current company chooses me as a one of the responsible staff to improve the company management system as generally and an especially in time management area the manual of management system has been created by outside party (out-resourcing German Party).
- Company Management circulate concession in regard of abnormal efforts has been noticed during accreditation process to get ISO Certificate 9001 -2008.
LANGUAGE SKILLS
Arabic : Excellent [Mother tongue]
English : Very Good, Writing/ reading & speaking.
French : Fair
REFRENCES CONTACTS
Sr. project Manager for Abu Dhabi Area:
Mr. Farid Ishak 050-1895540
Sr. Project Manager for Fujairah and north Emirates Area:
Mr. Wael Al kriady 050-4717960