Senior Planner / Scheduler Consultant, i-PiS Pty Ltd through PPSS and OTOC Australia, Oil and Gas / LNG Project / M&M

START Date
Experience Hours (Planning & Scheduling)
40000
Experience Hours (Cost Management)
40000
Experience Hours (Forensic Analysis)
30000

CURRICULUM VITAE:Archer Alfornon



SPECIAL EXPERTISE:

 

·    Primavera Scheduling & Resource Management

·    Microsoft Project Scheduling & Resource Management

·    Earned Value Management (AS4817-2006)

·    Project Performance Management (AS4817 Standard)

·    Schedule Risk Management

·  Dashboard Reporting

·  Schedule Forensic Delay Analysis

·  Data Base Creation | SQL | Oracle | Macro’s | VBS | HTML

·  MS Office | Advance Excel 2016

·  SAP | JDE

 



PROFESSIONALSUMMARY:

Archer has extensive experience in various technical, engineering disciplines, projects, maintenance and STO. He specialises in the development, implementation and management of all end-to-end project planning and project controls system, and offers invaluable support to the specific needs of project teams. His expertise involved in Major Infrastructures, Chemical Plants, Oil/GAS, LNG Construction Process Area, Mining Plant Site, Mechanical Design, Piping, Chilled Water Piping (CHWP), Fabrication and Installation, Project Planning preparation with the use of Primavera V3.1, P5/P6/P7/P8.1/P8.4/P15.1/P16.1 & Microsoft Project in application of SAP System & JD Edwards.

Archer’s ability to work so efficiently stems from a positive, open minded approach and well developed interpersonal skills. He oversees master schedules on all works, including planning, scheduling, cost control, progress measurement and earned value management. His deep knowledge of and aptitude for scheduling and progress systems and his proven ability to identify potential problem areas through critical path analyses, have, in combination with his expertise in formulating mitigating plans and fostering positive, working relationships, are key areas to ensure project success.

 

 

RELEVANTPROJECT EXPERIENCE:

BMD Construction, Rio Tinto MIA “Mine Infrastructure Area” 

Sept 2016 – Present

Snr. Planner / Scheduler Consultant

$50m

BMD Constructions offers civil and industrial construction services for major infrastructure projects throughout Australia. Expertise, experience and resources are applied across transport, water, rail, port, resources and energy projects as a sole principal contractor, managing contractor or in joint venture with other major contractor and design partners.

Hired as Senior Planning & Scheduling Consultant for AMRUN MIA (Rio Tinto) Tender. Provides professional Primavera Schedule with resource loading to adhere tender requirement for S-Curve, Histogram, Manpower requirement, ERP and Schedules. This includes mentoring BMD’s planners and schedulers.

 

OTOC Australia, NAURU Processing Facility

April 2016 – Present

Snr. Planner / Scheduler Consultant

$600m

Hired as Senior Planning & Scheduling Consultant/Project Controls for NAURU Project by Canstruct Pty Ltd. The scope has the following project stages: Stage 3 – ESI | Stage 5 – Correctional Centre | Stage 6 – Primary School | Stage 7 – Hospital | Stage 8 – PSV3 Stage 1 “Primary School Village” | Stage 9 – PSV3 Stage 2 | Stage 10 – PSV3 Stage 3 | Stage 12 – CRC “Community Resource Centre”. It involves: Building construction | In ground | Plumbing | Install | Fit Out | Electrical | Communications | Commissioning | Claims | EOT.

 

INCITEC PIVOT LTD, Gibson Island

Oct 2015 – Mar 2016

Lead TA Planner / Scheduler Consultant

$100m

Incitec Pivot Ltd is an ASX listed international company that manufactures, markets and distributes a range of industrial chemicals, fertilizers and explosives worldwide.

Hired as Senior Planning & Scheduling Consultant/Lead Turnaround Scheduler a member of the Shutdown Team – STO “Shutdown, Turnaround and Outage” to successfully deliver the Gibson Island Turnaround 2016. Working with the client management turnaround team that manage contractor’s onsite. Develop and creator of Ep6WEB a reporting tool on the web that has direct link to Primavera, dashboard and reports a.k.a The Turnaround WEB. View Ep6WEB short presentation: https://www.dropbox.com/s/uocli5voxu02y5n/Ep6WEB01.mp4?dl=0

 

 

Monadelphous, Eurombah Creek GPF

July 2014 – July 2015

Experienced Planner / Scheduler

$200m

Eurombah Creek GPF (Gas Compression Facility) 2 Trains consisting of PAU’s (pre-assembled units) HP and LP compressors, Dehydration facility and large compressor building, HV switch yard and associated works.

The purpose of the upstream Gas Processing Facilities (GPF) is to receive gas from the wellhead gathering system network where it is then compressed, dehydrated and metered prior to entering the main pipelines to Curtis Island. Each GPF consists of inlet separation and coalescing for removal of bulk water and solids from the gas stream, four stages of electric-driven centrifugal compression with associated gas cooling and scrubbing.

The scope of works includes full civil scope, material, supply, fabrication, surface treatment and delivery to site, storage at site and installation of structural steelwork, mechanical equipment, piping, civil, electrical, pre-commissioning and assistance in load commissioning and performance testing works.

 

 

Monadelphous, Wandoan APLNG

Feb 2014 -Jul 2014

Lead Planner / Scheduler

$20m

 

This scope covers the transfer and metering of Sales Gas under controlled conditions. The scope of work broadly includes the equipment and nominated material supply, fabrication, surface treatment and delivery to site, storage at site and installation of control and metering skids, structural steelwork, mechanical equipment, piping, civil, electrical, pre-commissioning, and assistance in load commissioning and performance testing works. The client is Australia Pacific LNG is a joint venture of Conoco Phillips, Origin & Sinopec to develop extensive Surat Basin coal seam gas reserves, process & deliver the CSG to an LNG facility located in Gladstone QLD, ultimately export up to 16Mtpa LNG to world markets.

 

Monadelphous, Wheatstone LNG

 May 2013- Jan2014

Experienced Planner

$300m

 

The contract covers construction, operation support and other services in the early phases of the Wheatstone project. It will include installation of surface and underground utilities, temporary services and access roads along with water, wastewater treatment and power generation facilities.

This is another significant contract reflecting our reputation for the safe and reliable delivery of construction and maintenance projects in the oil and gas sector. It also continues our relationship with Chevron Australia Pty Ltd and also Bechtel (Western Australia) Pty Ltd, the engineering, procurement and construction contractor for both the Wheatstone LNG Plant, BHP Billiton’s Worsley Efficiency and Growth Alumina Refinery Project at Collie, in the South-West of WA.

 

 

Monadelphous, Kestrel  CHPP

Jun 2011-May 2013

Lead Planner

$260m

 

Lead Planner |The scope included the structural, mechanical, piping, electrical and instrumentation upgrade of a Coal Preparation Plant including raw / produced coal stockyard and upgrade of existing stacker / reclaimers and Stockyards.

Tender Planner |Won 3 packages for AM05, AM07 & CHPP.

 

 

PROJECT HISTORY:

 

Project name

Role

Project type

Duration

OTOC Australia, Nauru Processing Center

Senior Planner / Scheduler

Major Infrastructure

Apr 2016 – Present

Incitec Pivot Ltd. Gibson Island Turnaround 2016

Lead TA Planner / Scheduler

Chemical Plant

Oct 2015 – Mar 2016

Monadelphous, Eurombah Creek

Experienced Planner / Scheduler

CSG

Jul 2014 – July 2015

Monadelphous, Wandoan

Lead Planner / Scheduler

CSG

Feb 2014 – Jul 2014

Monadelphous, Wheatstone

Experienced Planner

LNG

May 2013 – Jan 2014

Monadelphous, Kestrel CHPP

Lead Planner & Tender Planner

Coal

Jun 2011 – May 2013

Ambatovy Project (SNC LAVALIN INT’L INC. “EPCM”)

Snr. Planner/Scheduler

Lump Sum (US$4.761B) Nickel/Cobalt

Sep 2008 – Feb 2011

RasGas LNG Onshore Expansion Project Phase 2 (Chiyoda/Technip JV)

Snr. Planner

Lump Sum (US$4 B) LNG

Dec 2006 – Jul 2008

Various (CAT International Co. Ltd.)

Snr. Planning & Scheduling /Projects Controls Engineer

Heavy Industrial

Dec 2005 – Nov 2006

Various (Saudi ARAMCO Testing and Inspection (T&I) Planning and Projects Unit, Maintenance Div., KSA)

Maintenance Planning/Projects Engineer

Oil/Gas

Dec 2002 – Oct 2005

GRTA “General Refinery Turn Around”- Saudi ARAMCO, KSA

Shutdown Planner/ Project Controls Engineer

Oil/Gas

Mar 2004 – Apr 2004

Various (Projects & Maintenance – Al Suwaidi Ind’l. Serv. Co. Ltd., KSA)

Planner Engineer/Quantity Surveyor/ Mechanical Engineer

Oil/Gas

Oct 2001 -  Dec 2001

SALCON POWER Co.

Cadet Engineer Planning & Reporting

Power

Mar 2000 – Apr 2001

 

 

 

QUALIFICATION:

 

1.     Advanced Project Management in Primavera P6 Rel 7 Ed 1 by ORACLE University. Issued Date: 16 May 2014.

2.     Primavera 6.0 Enterprise for Project Management by STANFORD IT Learning, Certificate No. 11-024, Date: Feb 9, 10, & 11 2011.

3.     PUAWER008B Confine Small Workplace Emergencies by AVELING, Cert #: FIR032771, Date: 07June2013.

4.     Construction Training Workshop by Monadelphous, Certificate #: MT7094, Date 05June2013.

5.     MSAPMOHS217A – Gas Test Atmospheres by ERGT Australia, Cert. # 149424, Date: 4June2013.

6.     Senior First Aid by MEDIC ONE, Certificate #: 20135, Date: 31May2013.

7.     Safe Spine and Hazardous Materials Training by Safe SpineTM, Date 27May2013.

8.     PMASUP236B – Operate Vehicle in the Field by SPEEDAWARE, Certificate #: 12794, Date: 24May2013.

9.     RIIVEH305A – Operate & Maintain a Four Wheel Drive Vehicle by SPEEDAWARE, Certificate #:12794, Date: 24May2013.

10.  TLC2025A – Operate Four Wheel Drive Vehicle by SPEEDAWARE, Certificate #: 12794, Date: 24May2013.

11.  TLIC1051A – Operate Commercial Vehicle (Incl. Drive on Gravel Roads) by SPEEDAWARE, Certificate #: 12794, Date: 23May2013.

12.  RIIVEH201B – Operate Light Vehicle by SPEEDAWARE, Certificate #: 12794, Date: 23May2013.

13.  Hazardous Substances Safety Essentials, by AVELING Reference #: 126778, Date 17May2013

14.  Industry Certificate of Competency by Training Professionals Australia, Student No: TP-001113, Issued: 08June 2012.

15.  OHS Construction Induction White Card, QUEENSLAND, RTO No. 31973, Card No. 1498661, Issued Date 18Jan2012.

16.  Plant Health Safety & Environment (HSE), Permit to Work, WHMIS (Canada).

17.  PSME “Philippines Society of Mechanical Engineer” Member since 2000.

18.  Cebu Institute of Technology University Trainings, N. Bacalso Ave. 6000 Philippines:

Lubrication on January 19, 1999.

19.  Automatic Computer Aided Design (AutoCAD R.14) from Mar 22, 1998-Nov 1998.

20.  MATERIAL DEGRADATION and PROTECTION on November 19, 1998.

21.  Bachelor of Science in Mechanical Engineering since October 2000 at Cebu Institute of Technology University.

22.  Register License Mechanical Engineer since December 14, 2001 by Philippine Regulatory Commission.