P6 Project Notebook creation date?

Forum Topic

Hello All,I am using the Project level Notebook feature to record Monthly Progress Statements which are then exported in a csv file for use in other reporting systems. My challenge is:How can the Notebook entry "creation date" be found in the backend...

Aug 26, 2020

Rate of Placement

Forum Topic

Hi All,I'm looking for a table that gives the rates of placement for industrial construction - example how many hours does it take to put in a cubic meter of concrete (generally).  I looked through the forum and found a couple of links that don't wor...

Aug 26, 2020

Delay due to advance payment

Forum Topic

Hi All ,I'm working on a project started on 22-Mar-20 , as per the agreed contract ; an advance payment must be paid by the client at the begining of the project . until now the payment still not processed , the contractor is facing a lot of delay du...

Aug 26, 2020

FOR SALE -- A! EOT

Forum Topic

Unique UK number plate currently on retainer.For sale by remote auction - highest bid to [email protected] on or before mid day 5th September 2020 secures.Happy Bidding.

Aug 29, 2020

Manpower , Manhour & Productivity

Forum Topic

I have a big problem when I making the baseline Schedule  , Every Submittal for Approval the client make a new Comment ,To Summarize the problem ,The client need the schedule with Resource loading ( by Category And Manhour ) according to BOQ and Also...

Aug 30, 2020

Project List in Primavera

Forum Topic

Hi,I am trying to import activities and resources from excel (.xlsx) to primavera. After selection of excel file when a popup appear to select the project, where should I want to import the data, that project list window appear blank, without any lis...

Aug 31, 2020

Resource unit of measure

Forum Topic

Is any way to material resource as primary resource Second how to assign of unit of measure such as hour for labor and non--labor Third in resource tab of activity details of update primary resource is any setting to automatically update other resour...

Sep 2, 2020

Considering How We Think

Blog

We are living in interesting times. All countries are struggling to control the COVID-19 pandemic.  Societies are challenging their histories of racial and social injustice.  Fundamental beliefs are being scrutinized. Considering how we think and und...

Sep 3, 2020

Considering How We Think

Blog

We are living in interesting times. All countries are struggling to control the COVID-19 pandemic.  Societies are challenging their histories of racial and social injustice.  Fundamental beliefs are being scrutinized. Considering how we think and und...

Sep 3, 2020

Resource leveling activity interruptions

Forum Topic

We can specify which activities can be interrupted by resource leveling.What is the best way to report the interruptions on a table report?How to filter for activities with resource leveling interruptions?Activity splitting can be a cause for differe...

Sep 6, 2020

WBS Summary Activites Moving with Data Date

Forum Topic

Hi Experts, I'm Facing an issue, In my schedule, even though some of the WBS summary activities are already started, they are moving with the data date of the schedule.Every time when I'm changing the data date, WBS summary activites moving forward w...

Sep 9, 2020

Primavera - Relationship between activity

Forum Topic

Hello Everyone,Hope everyone is in good health. A doubt. I have received comments on a schedule,The use of Finish-start relationship is prefered (FS). Avoid as much possibe use of Finish-Finish (FF) plus lags and start -start (SS) plus lags relations...

Sep 10, 2020

Any better logic report reports other than what is in P6?

Forum Topic

Any better logic report reports other than what is in P6?  I have used this software for a long time, it seems odd the report writer is so antiquated and that there is not a default report that can be filtered on a code that simply lists the pred and...

Sep 10, 2020

P6 Breaks Page while Printing to pdf

Forum Topic

I am currently working on a project that turns out to be around 800 pages when 'optimize height by row content' option is checked.I have to do this because the Client wants to see all activities, start dates, finish dates,original durations, free flo...

Sep 10, 2020

Monthly Duration Not Giving Fixed Monthly Hours

Forum Topic

Hi guys,I have the following settings:1. In Calendar, monthly hours are 1502. Duration Format (in User Preferences) is set to Months.Now, when i enter activity duration to 1 month,  I see 150 monthly hours, which is fine.  But when i put 2 months dur...

Sep 11, 2020

SAP Business By Design

Forum Topic

Hi all, Im really struggling with SAP ByD.Firstly, I can't seem to export a Cost Breadown Structure for all 0 (zero planned Costs). SAPBYD will only export non zero Tasks.Secondly, SAPBYD, does not recognise any expenses as a remaining Planned Costs....

Sep 13, 2020

NEC 3 compensation event - forgotten impact from a closed CE

Forum Topic

Hi, Good day. A previous CE is already closed with no time impact and only cost implication. The Contractor withdawn its time impact in that CE because of conflict with the PM assessment. Now, another new related CE is being prepared which includes a...

Sep 14, 2020