Search

Driving and Free Float Activity Properties In Primavera P6

Forum Topic

I just wrote this article which explores the value and how to track ‘Driving’ relationships, as well as, activity ‘Free Float’ in Primavera P6 Professional. http://ow.ly/UY0KFI hope this is useful to folks here.

Nov 23, 2015

P6 EPPM 15.2 connection wizard PRA

Forum Topic

Trying to establish the connection from PRA 8.7.0076 to P6 EPPM 15.2 (localhost). No problem using the connection wizard, but unable to access the EPPM database, Getting the following error messages. The first is trivial - I think. P3eKiller Run-time...

Nov 24, 2015

Site Instructions Vs. Variation Orders in Assessing EOT

Forum Topic

Hi All!I am working on a Client side, I have a project scenario as below.1.       In our project, the conditions of contract states that Contractor cannot proceed without the approval of V.O.2.       Site Instructions has issued to Contractor before ...

Nov 24, 2015

Forecasting resources from updated schedule

Forum Topic

Dear All, I'd like to know what the best practice and/or your experience is with:1) Obtaining planned resource from and an update schedule (budgeted? / baseline? / remaining?) to compare against actual from timesheets/daily reports. 2) Forecasting re...

Nov 24, 2015

Incompatible project conditions - need help.

Forum Topic

Hi all! On one current project I have on one side - clear and fixed delivery date, and ongoing changes from client (in design, flow etc.) on other side.  So now I have groving scope of work and client that want project to be done by date defined for ...

Nov 24, 2015

Unable to delete activities & Links on P6 8.3

Forum Topic

Explanation: I have recently started using primavera (p6 version 8.3) in shared mode, and I am encountering a new problem where many actions done are not really saved. For example, when I delete an activity, at first it doesn’t show anymore, but when...

Nov 25, 2015

Two week look ahead for MSP 2010

Forum Topic

Hello All, I know this topic has been posted before; however, I was wondering if someone can drill it down for me considering that I am a beginner in MSP 2010 and to Project Management.  Basically, the project schedule has about 700 lines of tasks an...

Nov 26, 2015

New activities in approved baseline

Forum Topic

In a design and built contract, the contractor submitted a eot claim due to delay in a permit. A revised completion date was awarded to the contractor.Since it is a design & built contractor the real quanties and clear scope was not defined in the be...

Nov 26, 2015

P6 - New baseline not matching the rescheduled current programme?

Forum Topic

Good afternoon,Under maintain baselines, I have created/'add' a baseline of my current project as a new baseline.Then under 'assign baselines', assigned the new baseline under the 'project baseline' and 'primary' allocations.My baseline bars displaye...

Nov 26, 2015

Activity Relationship

Forum Topic

Am reviewing a construction schedule, i have seen some activities predecesors assigned morethan onece with different relationship meaning... same predecessor was assigned with Finish-Start relationshp and aswell assigned with Start-Start relationship...

Nov 26, 2015

How can I see how an existing Report is made up?

Forum Topic

Hi, There is an existing report that I want to be able to recreate and understand.How can I see what source data was used to create the report and how it was set up?If I select modify I just get the report layout. Thanks very much Dave

Nov 27, 2015

Trendline for Future

Forum Topic

HI all  Can anyone help me with the way how to make a futture trendline from Primavera??

Nov 30, 2015

Importing P3 PRX Files into Primavera P6 Professional

Forum Topic

While not quite as mainstream now as it used to be, there are still some great project templates that folks have in P3. Here's how to import P3 PRX files into Primavera P6 Professional http://ow.ly/VgqLd

Nov 30, 2015

Outline codes in MSP 2007

Forum Topic

We are currently using 2007 for our shutdowns and have grouped the Outline codes for tasks that are being imported from our CMMS system from work orders created by planners . The codes are alpha and when grouped are not displayed in the order we woul...

Nov 30, 2015

EVENT INTERCEPTED

Forum Topic

An application event has been intercepted Please note the event code for reference Event code DSEOL-0412-8 Does anyone encountered the same problem while installing P6.? Please let me know how to fix this

Dec 1, 2015

Multiple Milestones - Need Filters

Forum Topic

After some searching I have not been able to locate a solution yet. Hopefully someone can point me in the right direction.In my schedule I have 4 milestones:Section 1, Section 2, Section 3 and Section 4.Each section consists of different buildings. I...

Dec 1, 2015