Summary level network diagram
Forum TopicWe can create activity level network diagram. Is there any option to create summary level or level 2 Network diagram. Appreciate if anyone can help.
We can create activity level network diagram. Is there any option to create summary level or level 2 Network diagram. Appreciate if anyone can help.
Dear friendsPlease advise about your comments for the below mentioned secnarioExample as per Tender Drawings the Qty of foundation Concrete is 100 cum , while in the BOQ by Mistake its mentioned as 50 cum.Now there has been changes and qty as per new...
Dear friendsPlease advise about your comments for the below mentioned secnarioExample as per Tender Drawings the Qty of foundation Concrete is 100 cum , while in the BOQ by Mistake its mentioned as 50 cum.Now there has been changes and qty as per new...
Dear Sir,I have 1 Issue regarding calendar. I have made 5 Days/week calendar with hours 08 to 16:00. when assigned to Activities, the Finish dates of activities and start date of its successor are same means successor is not starting in new day.... H...
All,any one can help me please download a salary survey for planners salary in 2016-2017 per locations, (within UK ), level of the planner (Junior, senior etc,) permenant or contract and industry Many Thanks
Hi group: Are any guild members planning on attending the Project Controls Expo in london on the 16th of November? I will be there, and it would be great to meet other guild members if they are also attending. If you will be there and would like t...
Hello all, I am interested in knowing the difference of rates between traditional masonary and using a brick slip system (gee brick), is there a time saving?Thanks
The average life of a PMO is about 4 years and here's why http://ow.ly/qSux305JzqT
Hi everyone. I am new to Planning Planet and have having some issues with MS Project 2016. If somone could respond to these issues I wouild approciate it.1. I can open two projects at the same time but cannot drag them to different screens. If I ...
Hi, I am an assistant planner with just under 2 years experience, I was looking for some books that would enable me to improve my skillset. I have come across Construction Planning, Programming and Control by Brian Cooke. Is this a good book to help...
Here's how to use Primavera P6 EPPM R16.1 to model cure time lag http://ow.ly/2GeZ305M0Dc
Hi planners,Can anyone share me any calculation sheet for the above matters..mail me : [email protected] help is greatly appreciatedtq
I'd like to create a schedule of dates that move with the programme for notification periods flagging when to submit documentation. Example would be a method statement that needs submitting 20 days before the planned date that work starts. As the the...
I am running P6 R 8.4 is there a way to change the settings default when a new project is created? I am looking to set the default of define critical activites as longest path instead of Total Float less than or equal to. I work with a variety of s...
Contractor to provide a critical path (as-built versus as-planned) schedule analysis for the Work assigned to Contractor which takes into account concurrent delays and the delays caused by Contractor.As a contractor we submitted Global Claim at end o...
Good Morning to All, Anybody can help me by providing the productivity rates of machineries which we were using in infrastructure projects. Thank you.
I want to make 3 different calanders for a project which needs to be 8hrs/5day working, 12 Hrs/6day working and 24hrs/7day working. In the "Time Periods" section of each calander what values i should use for Hours/Day, Hours/Week, Hours/Month and Hou...
Hi All,Recently my office laptop with 7.0 crashed and sent for repair, during this period I used my primavera 8.2. When I received my laptop I am not able to import the XER back to 7.0 with error message CVRJC-3324-A, related to some RISK. I checked...
Hi All,I was trying to modify the budgeted units, by exporting it to excel and import back the modified values. Resource and units are set for all activities.The issue is that in the exported excel file the sheet for resource assignment(TASKRSRC) is ...
This video shows how to display a Total Float bar in the Gantt Chart in Primavera P6 http://ow.ly/ueRY305Vsk0