Search

Primavera P6

Forum Topic

Hi allApologies if am in the wrong forum but I've just joined PP and am looking for advice on the best value way of training in Primavera P6. I'm expecting to use it in the construction/tranportation sectors. Many Thanks Gary

Jan 23, 2013

Consecutive postings

Forum Topic

Is it possible to setup the postings so that whenever a PP member attempts to enter consecutive postings within a certain time frame (say 20 minutes) the system will issue a warning it might be a duplicate and not accept the second until a response b...

Jan 23, 2013

Primavera P6

Forum Topic

Hi allApologies if am in the wrong forum but I've just joined PP and am looking for advice on the best value way of training in Primavera P6. I'm expecting to use it in the construction/tranportation sectors. Many Thanks Gary

Jan 24, 2013

Publishing in EPM

Forum Topic

Hi, new to this site and fairly new to planning so please forgive. I want to run some cost&resource profiled from MSP using the data in EPM. I know i need to publish the plan to run this data but what wil happen to the version of the same plan saved ...

Jan 24, 2013

S-Curve and Histogram in one XEL sheet..

Forum Topic

Dear All Planners,   How I can put both S-Curve and Histogram in one XEL sheet? What are the functions I have to follow?         Thank you, HANSON 

Jan 24, 2013

"Necking" Bars on Gantt Chart - MSP2007

Forum Topic

Hi,   Apologies if this has been covered before. I'm trying to show a task bar "necked" where there is no working time. In this case, I have a number of tasks that have a calendar that only allows work to take place between April and October, so I wa...

Jan 24, 2013

Multiple Databases

Forum Topic

Has anyone any experience of using multiple databases? I am assuming that once you have set up an additional database then all you do is drop down to the correct database when you log on?The "orignal" database is kept intact?Neil

Jan 24, 2013

Assigning email address to use project issue function

Forum Topic

Hope someone can help,   I am using P6 Version 8.2, within the project issue function i am trying to send out emails according to the issues raised within the programme, it currently says i have no return email address setup. Could somebody advise on...

Jan 25, 2013

Baseline variance problem

Forum Topic

I am getting primary baseline variance even though there is no baseline set and the current programme is the primary baseline. I am doing delay analysis and have several templates copied from submitted programmes and the templates are used for analys...

Jan 25, 2013

Removing Constraint from Approved Baseline

Forum Topic

Hi,A friend of mine working with a consultant, has a claim from the contractor. The client on the submission of the design drawings recommended a change within the 28 days of the submission. The contractor resubmitted the design and after a long peri...

Jan 27, 2013

Calendar to be used for evaluating the impact of delay event

Forum Topic

 If need to evaluate the impact of delay event whereas, the contractual programme's calendar is a 6 working day, what calendar to be used in the relevant schedule which is to be used to produce the Impacted Schedule, do I have to change the contractu...

Jan 28, 2013

Primavera 6.8 with windows 8

Forum Topic

i tried to set up primavera 6 version 8  with windows 8 and can,t how to finalize?and also what versions of primavera 6 is working with windoes 8?

Jan 28, 2013

Exporting & importing to EXCEL

Forum Topic

I successfully export P6 files to excel,but when I importing back excel to p6 after I load resources,BOQ,cost either the program said out of memory or not responding.I have 25,000 activities in the Project. Your help will be highly appreciated.

Apr 12, 2012

Calculation of remaining Duration

Forum Topic

I've got a problem with regards to the remaining duration in P6 version 7. It does not seem to be calculated at all. It stays identical to the orginal duration.I've tried to adjust the settings in the calculation Tb of the project in concern, unfortu...

Apr 12, 2012

Strip Actuals

Forum Topic

How do you strip all actual from a file includng dates, %, hours and cost? I need to create a new project from an existing one and want to use the old one as starting point. Thanks

Apr 12, 2012

Starting MS PRoject 2010 (Videos)

Forum Topic

Introduction Microsoft Project -MSP- is a project management software developed by Microsoft. MSP is designed to help project managers in developing plans, tracking progress, managing the budget, assigning resources to tasks and analyzing workloads ....

Apr 12, 2012

Man Hours versus Time S Curve

Forum Topic

Dear Schedulers,How I can do "Man Hours versus Time S Curve" from P6 data? I mean I don't know how to calulate the Man Hours? I appriciate any idea from you. Thank you, Hanson

Apr 12, 2012