Last Planner System

Forum Topic

I'm looking for some information on the Last Planner system? Any information or articles to read would be appreciated? So far all I've heard is that it involves a lot of post-its, so I'm looking for more information.Thanks

Nov 9, 2018

Primavera P6 EPPM 18.8 Publish Projects and Team Usage

Forum Topic

I want to display my project's resource allocations in team usage, but I keep getting the message:"One or more projects are not published. Publish projet to view data."Unfortunately, when I try to publish my project I find that the "Publish Projects"...

Nov 9, 2018

Primavera Training

Forum Topic

Hi everyone,I was hoping someone could assist me in finding a good primavera course.I am an advanced user of MS project, by an advanced user, I mean I know all about planning and scheduling best practices, I understand project controls concepts ie CP...

Nov 10, 2018

Help required selecting appropriate production management software.

Forum Topic

We run a small machine shop with a design department. We undertake job shop and small batch machining work. We also produce assemblies and machines. This means (especially when considering machine builds) there can be numerous sub-assemblies, sub-sub...

Nov 10, 2018

P6 R7 installation in Windows 10

Forum Topic

I am trying to install Primavera P6Rel7 on laptop with Windows10 Operating System.I have installed MySQL Express but data is not connected.Can anyone provide sequence of activities for connecting of database?Regards

Nov 12, 2018

Rule of Thumb/Best Practice Resource per m2

Forum Topic

Hi allFairly new to the PP site so apologies if i am posting in the wrong feed.I am looking to demonstrate to a client that the increase in scope requested without increasing the duration at the work face will cause all sorts of resourcing problems.P...

Nov 13, 2018

PSnext

Forum Topic

Hi I am currently having an issue with am installation of PSNext in my environment, we have an older version of PSnext that is running in the environment, however it worked well with older versions of Java installed on hte user's computers up until v...

Nov 14, 2018

Text formatting in iOS safari not respected.

Forum Topic

Not sure why, but for some reason, the text formatting is not working when adding comments from safari on an iPhone. In order to have carriage returns included in the saved post I am having to manually add the < br > tag to get a line break. This is ...

Nov 15, 2018

Date Variance Trends

Forum Topic

When dealing with Date Variance it might be convenient to have the following options.Days vs Hours - some jobs are scheduled by the hour, some jobs use workdays with different hours. Date difference vs. Activity Calendar - at times it is of interest ...

Nov 16, 2018

EoT (TIA v/s Window Analysis)

Forum Topic

Hello,Can anyone help  understand the difference in between Time Impact Analysis and Window Analysis for the purpose of Extension of Time and delay analysis.I have refered to few methods but I feel both were same.  I would appreciate any help in unde...

Nov 18, 2018

Trace Driving Predecessor Logic

Forum Topic

For people new to Microsoft Project (MSP), here is a link to a blog post on how to trace driving predecessor logic in Microsoft Project. It shows where to find MSP’s version of the “Driving” checkbox & “GoTo” button used  to trace relationship logic ...

Nov 19, 2018

Sequencing and Relationships guidance

Forum Topic

I have 24 different equipment (3 columns, 10 exchanger, 11 drums) for maintenance. The date and Month of maintenance is not decided yet. And Schedule should be in such a way that, once the Project start date is changed all the maintenance dates have ...

Nov 20, 2018

P6 EPPM 18.8 Team Usage

Forum Topic

I have a resource loaded project, and I would like to examine this project's resource allocation in P6 EPPM 18.8 Team Usage. But every time I select the Team Usage tab I get the below message:Information: One or more projects are not published. Publi...

Nov 20, 2018

Queries on where to go from here

Forum Topic

Hi,I am presently at the point in time where I need to decide what and how I want to continue to develop.Just a little introduction about my background, I have a degree in Civil Engineering and have approximately 10 years experience as a Project Plan...

Nov 21, 2018

% Complete

Forum Topic

While updating progress of my Project schedule, I am getting some values of unit% complete and physical % complete against certain value of schedule % complete, with each scheduling BUT.. why I am not getting performance % complete? Performance % com...

Nov 21, 2018

Detailed Resource allocation after Export and then Import

Forum Topic

Hello Everyone, Need some help. Can we Export Activity to Excel and then populate the resorce in it and import it back to P6. And that too if the same activity has multiple resource like, Activity - Foundation for TankResource:Steel Fixer - 40 HrsCar...

Nov 22, 2018

Recovery Schedule and EOT Claim Analysis

Forum Topic

Hi All,As specified in Fidic Contracts, if the Contractor failed to meet the progress rate as agreed in the approved Baseline Schedule, he needs to submit a recovery schedule, elaborating how he intends to recover his delays and bring the Project bac...

Nov 25, 2018

Budgeted Labout Units at WBS Level

Forum Topic

Hi All, I want to calculate the estimate weights for individual activities based on the labour units for Top down estimation. My idea is to use Global change where in I can divide individual activity's labour unit by the total labour unit of WBS. Whe...

Nov 26, 2018

Automatic tool for product management

Forum Topic

Hello everyone!   Sorry for bad english and grammar, I am not a native speaker...  I work at small metal metallurgical plant in East Europe. We produce different pieces of metal, they can be divided by size, materials, strength and so on. We have own...