Primavera updates
Forum TopicHi all,My question is about how ı can preserve dates after updating program in P6. I dont want my program shift activities finishes date after updating.Thanks in advance.Amir.
Hi all,My question is about how ı can preserve dates after updating program in P6. I dont want my program shift activities finishes date after updating.Thanks in advance.Amir.
Hello,I am trying to solve a problem in P6 and everytime I do a google search it points to primus solution prim39021, but I can't find this on oracle support. Does anyone know where to look for it?
Hi, AllThis forum topic I have created to share an online survey which is related to my MSc Project. Please respond to this sruvey, it will help me in my MSC Dissertation. Changes & Change Management in EPC Construction ContractsOpen SurveyThanksAfta...
Dears,I have a problem with my p6 stand alone version, I had took abackup file before chaning my windows and when i set up p6 again i tried tor restore my databse but it failed and i got the attached message.Please advise because i lost a three year...
hi all,most threads that i have read on price/unit having a carat symbols seem to suggest that this happens only when you do not have a price/unit. On the programme i am working on however, the price/unit has been allocated and still all but one reso...
Hi Dear,how to edit exchange rate in EPPM , for example I want to change the base rate with 1/23450000000000?thanks
Donald Trump asked Her Majesty some advice."I know I am a President but I would really like to called Emperor""Mr Trump to be an Emperor you have to be in charge of an Empire""How about being a King then?""But you do not rule a Kindom""What can I cal...
hello i make my graduation project on construction of a 500/220 kv gas insulated substation , i have the plan of civil works but i don't know anything about the electrical part. so can you please help me by sending me a plan or WBS of any high volta...
Here's a great tip on how to display Driving Tasks in Microsoft Project http://ow.ly/y9Zo309ygRK
Hi all,I was just wondering if it is possible to see cross-schedulecritical paths; e.g. if I have a project split into 3 schedules, which are linked together with inter-project dependencies, is it possible to see 1 critical path for the whole thing?T...
I am attempting to aplly different sorting parameters to individual WBS levels rather than sorting the entire scedule with a single sorting parameter. Is this doable?
Hello,Firstly, apologies if I have posted this in the wrong section.I am currently undertaking a Bachelor of Engineering Degree in Construction Engineering Management at the University of Portsmouth. In fulfillment of this degree I am required to res...
Hello,My company is working a data science initiative which requires me to understand more about the "back-end" of P6. Does anyone have experience with the tables/fields that make up P6? I am brand new to the software and am wondering about a couple ...
I have a suite of projects that is resource loaded with defined roles first and people filled in as resources once they are assigned. I have a stacked histogram set up to show by resource and by role separately. Is there a way to combine that functi...
Hello,P6 has a default 8hrs/day (Hours/Time period). If we create a calendar of 10 hrs/day, the duration gets affected because of the default 8hrs/day. What's the best way to fix this. Regards,SAN
Several features in Primavera P6 support personalizing the look and feel of schedule reports and here we show you how http://ow.ly/Pz4L309Fmlr
Hello everyone,I have problem saving P6 acitivities that are entered in a different language. I'm using P6 16.1 and my activity description is in Japanese. When I'm done entering the activities and exist the schedule, all activities would display que...
Please i do have much float whan am preparing baseline program, can any one help me? And what are the things to consider while preparing a baseline Program for best result?
PMI Aberdeen - Tuesday 14th March 18:30hrsSummary:After Forty years implementing computerised Project Controls, why is everything still the same?Nearing the end of his career, David muses on a lifetime of trying to help people manage projects better....
Hello everyone,I have an activitiy (not started) which is scheduled to start in 29 March 2017 and finish in 08 May 2017. However, when i chect the remaining total cost layout, it shows the total cost only in May 2017. It does not distribute the cost ...