Forum Topic

Dear Planners, My currency as I assigned in the program is "x", however when I close my project and open another project later has a different currency, close this project and open my project, the currency is changed to the last one. This always happ...

Jan 2, 2011

Changing Currency without changing the numbers

Forum Topic

Dear All I just developed a programme with resource and cost loaded, now the default of the currency was in USD, it should be in QAR, how can i change the currency without changing the numbers or figures (eg USD 10 to QAR 10)? Regards Alfon

Jan 3, 2011

Projected Time

Forum Topic

Dear Friends Anybody breif me about Projected time in Construction works. Iam not Famalier with the word projected time .....     With regards Arun.V

Jan 3, 2011

Projected Time

Forum Topic

Dear Friends Anybody breif me about Projected time in Construction works. Iam not Famalier with the word projected time .....     With regards Arun.V

Jan 3, 2011

Projected Time

Forum Topic

Dear Friends Anybody breif me about Projected time in Construction works. Iam not Famalier with the word projected time .....     With regards Arun.V

Jan 3, 2011

Copy a WBS from EPS to Another EPS

Forum Topic

HI Friends How to copy a WBS from one EPS project to another EPS project. and i want know that possible to view all project(whatever in the database) in WBS layout mode.

Jan 4, 2011

Copy a WBS from EPS to Another EPS

Forum Topic

HI Friends How to copy a WBS from one EPS project to another EPS project. and i want know that possible to view all project(whatever in the database) in WBS layout mode.

Jan 4, 2011

Hiding Activity Codes while filtering

Forum Topic

Hello Everybody:As we know the hierarchy while grouping the data in ms projects depends upon the ID of the code and not like primavera where the data is sorted on the basis of the order as secified in activity code.Now to attain this i creadted code ...

Jan 4, 2011

CAN'T PRINT 36" X 48" SINCE UPGRADING TO WIN 7

Forum Topic

When I want to create a pdf report to email the program will automatically resize the report to some sort of "fit to page" format during the "print" process, it will not let me change the size to 36" x 48", I am only trying to create the pdf to email...

Jan 5, 2011

P6 Installation

Forum Topic

Hai Can We install P6 Standalone & Server Based in Same System My P6.7 is Working with Server , I want Standalone to be install in my Desktop. Can We install P6 Standalone & Server Based in Same System.   Regards Anbin 

Jan 5, 2011

P6- In a 2 shift manhour distribution not seen.

Forum Topic

[[wysiwyg_imageupload:174:]]Dear All, I prepared the schedule for a shutdown & loaded with resources.Unit of time used is Hrs. & the calender used is 24/7.I wanted to view the activity distribution over the project time in 2 shifts,I selected the spr...

Jan 5, 2011

P6- In a 2 shift manhour distribution not seen.

Forum Topic

Dear All, I prepared the schedule for a shutdown & loaded with resources.Unit of time used is Hrs. & the calender used is 24/7.I wanted to view the activity distribution over the project time in 2 shifts,I selected the spread sheet on the top screen ...

Jan 5, 2011

Activity Percentage Complete vs Schedule Percentage Complete

Forum Topic

 I am working in a construction company and I prepared a cost loaded schedule but I am confused while updating of my schedule.Schedule Status:         Duration Type = Fixed Duration & Units                                % Complete Type = PhysicalWBS...

Jan 5, 2011

Level of Effort Percentage complete?

Forum Topic

Morning, Have a few level of efforts in my current plan.  Haven't used them for a while and I am a little confused to how  the 'LOE' updates its percentage complete in relation to it's predecessors and successors. I have one LOE with four activities ...

Jan 5, 2011

Default calendar changed but made no impact

Forum Topic

Dear fellow professionals, I'm havign to use ms project 2003 to plan for a very small job, but with resource and number of hours (in work). The actual working hours for all resources are 8-12, 13-16:30, so 7.5 hours per day and 37.5 hours per week. S...

Jan 5, 2011

Default calendar changed but made no impact

Forum Topic

Dear fellow professionals, I'm havign to use ms project 2003 to plan for a very small job, but with resource and number of hours (in work). The actual working hours for all resources are 8-12, 13-16:30, so 7.5 hours per day and 37.5 hours per week. S...

Jan 5, 2011

Storing Multiple Past Period Performance

Forum Topic

Hi PP, hopefully someone can help or answer my question. I have created a batch of Financial Periods for each week of 2011 (wk1 = 02/01/11 to 09/01/11 etc). But my company has multiple projects which are updated on differenet dates & have different d...

Jan 5, 2011

Opening too many projects

Forum Topic

I accidentally opened too many projects on the serever, and I get an error message that the system is out of memory. How do I escape this locked mode I am in?

Jan 5, 2011

communication manhole project

Forum Topic

Hi, I need a sample communication manhole project at primavera. If somebody have pls help about this.Thank you.

Jan 6, 2011

New batch Timesheets cannot be opened

Forum Topic

I created a new batch of timesheets for 2011, but they cannot be opened by the Progress Reporter users.- I see them in the list of created timesheets in Admin\Timesheet Dates...- In Admin/Admin Preferences... the number of future timesheets users are...

Jan 6, 2011