Search

Free Gantt Viewer and DCMA 14 for Primavera

Forum Topic

Hello Plannersi have written  an excel macro that perform the metrics for DCMA 14 ( ok only the first 10 tests), and draw a gantt Chart in Excelyou can download it in https://code.google.com/p/xer-reader/a short tutorial is available herehttps://www....

Mar 4, 2014

Primavera Update from xer file

Forum Topic

How could i update a primvera file from another xer file if 1- the 2 file have different wbs location (which mean than in the first xer file one level of the wbs is under wbs while in the other xer it is existing but under anther wbs )2- we donot nee...

Mar 4, 2014

Total Float

Forum Topic

Dear All,  I have received a shcedule from Contractor for review with activties having very high float like 260 days, 120 etc........same like free flaot is very high. Its 16 months project . Is there any standard practice limit  for activities could...

Mar 5, 2014

Relationship Logic Type

Forum Topic

This question may have been posted before? Does anyone know of a way to identify Relationship LOGIC TYPE (as distinct from ordinary Relationship Type; FS,SS....) I have identified 3 logic types (there may be more); Physical Logic - i.e. can not physi...

Mar 6, 2014

Design and Built

Forum Topic

Hello Guyz! I am new here and i found this website interesting, Below are my questions and i hope anyone could hellp me out. 1) What does the term " Design and Built Project " means? I was asked in an interview, and i don't actually know the meaning ...

Mar 6, 2014

Design and Built

Forum Topic

Hello Guyz! I am new here and i found this website interesting, Below are my questions and i hope anyone could hellp me out. 1) What does the term " Design and Built Project " means? I was asked in an interview, and i don't actually know the meaning ...

Mar 6, 2014

History information

Forum Topic

Good dayI need help. I took over from a previous planner and now they want progress on previous dates.for example they want early start cost and late start cost for a specific date in the past.Is there a way in primavera that I can recall that inform...

Mar 6, 2014

NTL constraint does not work always

Forum Topic

Vladimir,whilst I was looking at the subject of exceptions, I noticed, that my favorite NLT constraint  does not always work as I would expect it to.In the example below you will notice, that in the 2nd case it does not work, because the activity wit...

Mar 6, 2014

Dissertation Questionnaire - BIM & health and safety

Forum Topic

I am a student at Oxford Brookes, studying Project Management. The aim of this study is investigate building information modelling, to gain an understanding of its success in terms of programming & 4D - Visualisation. To assess how that relates to he...

Mar 7, 2014

Holding the activity and transferring its resources

Forum Topic

I am new to primavera p6. I have a question, I holded an activity i.e suspended from 9-Mar-2014 and resuming on 13-Mar-2014. Now I want to transfering resoruces for on-hold dates to another activity which will finish on 11-mar-2014. After that I will...

Mar 9, 2014

Can't write comment on feedback field

Forum Topic

Dear All,I have problem about PM6, before every things quite well with PM6 on my old laptop. But, after my IT installed PM6 on my new laptop, I can't write comment on feedback field, and can't adjust header/footer of report when I print reports by PD...

Mar 9, 2014

Progress checking as Physical

Forum Topic

Hi,I have a problem in the progress checking in P6.  I have selected the physical progress and duration type as fixed duration & units.After updating an activity with 50% progress, the peformance percentage of the activity can be calculated with EV m...

Mar 9, 2014

Error connecting to Primavera Web Services from Navisworks

Forum Topic

We are trying to connect to Primavera P6 V8.3(Web Services) using Autodesk Navisworks. It used to work for everyone, but is currently only working for one computer in our office. Other users are getting:An error occurred while selecting a project fro...

Jul 29, 2016

problem in p6

Forum Topic

hi guys ı have a problem in p6it says that untranslated ıd problem.this problem is on everywhere (on bottom, on entrance page etc...)ı put a picture of it please help me with these proble.How can ı solve this thanks[[wysiwyg_imageupload:4370:]] [[wys...

Aug 1, 2016

Is there a way of entering progress to a historic progress period?

Forum Topic

Hi,I am trying to enter progress for a project where I need to adjust percentages in a progress period which goes back in time.There are more progress periods after this.I have two columns, one is Actual % complete and the other is Planned % complete...

Aug 1, 2016

Why "Save"

Forum Topic

When I have finished typing, I have a choice of "Preview" or "Save"I think it should be "Preview" or "Post", there might be fewer duplicate posts. 

Aug 1, 2016

Spider Project Versions - Professional/Desktop+/Desktop/Lite

Forum Topic

I wonder what will happen if a file that includes access rights is attempted to be opened with Desktop version?Will it ask for username and password and allow the user to open the file?Please expand; I am interested in understanding how different ver...

Aug 1, 2016