Search

Shrink activity codes rows not relevant to an activity

Forum Topic

Hi,When I group and sort activities by activity codes in the order; PHASE, EWP, CONTRACTOR and DISCIPLINE, there are 4 rows on top of activities for each code. If there is single activity and I assign it two codes PHASE and EWP, remaining two rows ap...

Aug 26, 2014

Activity % Complete

Forum Topic

Hi Members,Can anybody help me with updating activity % complete from importing excel file. I am currently facing issues in this. I can and have been able to export my p6 file to excel, update and re-import and its all working fine for BudgetedTotal ...

Aug 27, 2014

Construction sch. link to M/C sch.

Forum Topic

I'm a construction planner of offshore facilities such as fixed platform, FPSO, SPAR for oli&gas industries. WE've divided FPSO into small structural block (200~400 EA) and prepare consruction schedule for each small structural block. And then small ...

Aug 28, 2014

Resource Names and Automatic Capitalisation

Forum Topic

HiI'm typing in resource names in the "Resource Names" column, and the odd one is automatically capitalising the first two letters and I don't want it to (I think this is because I may have typed the name in incorrectly at some point, pressed return ...

Aug 28, 2014

P6 - Budget at task level and Actuals at Summary level

Forum Topic

I would like to enter budget cost by loading resources and expenses on activities (for example carpenter 8 hrs, truck 1 day, lumber $250), but our accounting system tracks cost at a higher level, so I would like to enter actuals at a higher level. Is...

Aug 28, 2014

GPC still a going concern?

Forum Topic

Hi Jo or anyone else from GPC, Can you give us a bit of an update on what is going on with the GPC please? The fellowship applications process seems to have completely stalled, and I can't find any evidence of any activity in any area from GPC since ...

Aug 29, 2014

Problem with Primavera Export from P6v7 to P6V8.3.2

Forum Topic

Hello There,  I just created a schedule using Primaver P6v7 and everything looks fine just as expected but the problem Im facing now is that my boss uses Primavera P6 v8.3.2 and something is not looking right when he imported the file into his system...

Aug 29, 2014

Resource Assignment Dates not equal to Activity Dates

Forum Topic

I am experiencing consistent problems with the dates on the Resources assigned to an Activity being at variance to the dates of that activity despite them being originally aligned.Does anyone know the mechanism, settings or steps that may been taken ...

Sep 1, 2014

Urban Planning

Forum Topic

Dear All,I am preparing a schedule for urban design, need you cooperation to advise the project phases that we are using for urban planning ThanksRamin

Sep 3, 2014

Need to configure database every time I log in P6 8.3.2

Forum Topic

Dear All,Recently every when I want to log in P6 it asks me to configure database! I didn't have this problem before. would you please advise?Also it take a long time (around 3 minutes) for P6 to come up , also it didn't have this issue before.Would ...

Sep 4, 2014

Need to configure database every time I log in P6 8.3.2

Forum Topic

Dear All,Recently every when I want to log in P6 it asks me to configure database! I didn't have this problem before. would you please advise?Also it take a long time (around 3 minutes) for P6 to come up , also it didn't have this issue before.Would ...

Sep 4, 2014

Choosing the right certification

Forum Topic

Dear All,Ii have completed 3years diploma in Electronics & Communication with 5years exp. working as Planning Engineer in Saudi Arabia (Gulf). I would like to know the best suitable certification. Im in delimma regarding few certification such as1. S...

Sep 4, 2014

P6 Checkout Feature

Forum Topic

Can someone explain how the checkout feature works and a good example where it will be useful. I know when someone checkout a project it becomes readonly so that noone can modify it until it is checked back in. Primavera gave an example where a sched...

Sep 5, 2014

Updating P6 Programme for remeasured Contract

Forum Topic

Dear PP Experts,We have a road project and it is under a remeasured contract. There are differences between BOQ Quantities (loaded in the programme) and the actual quantities such as volume of excavated materials, etc. This means that the activities ...

Sep 8, 2014

PRX File Format

Forum Topic

Hi,We submitted our programme to the consultant for approval. Now our Employer's Sr. Planning Engineer needs the PRX file of the programme. The Planning & Cost Control Sr. Manager verified the letter while Planning & Const Control (acting) Director a...

Sep 8, 2014