Search

Forecasting and Trending

Forum Topic

I currently am running projects that are fairly short in duration (3 months).  I progress daily and progress using Physical % Complete since I can measure units completed.  Since the duration of each project is short my CPI seems to be manic.  Up one...

Sep 22, 2012

Time versus Quality

Forum Topic

  Hi All, Does time affects quality or quality affects time? May I ask your opinion. Thanks and regards. Dominador Santos

Sep 23, 2012

Connection Problem

Forum Topic

Can anyone explain this connection problem please? Arrived at work this morning, tried to log on and get this messege?? Everything was fine on Fridat when I left?? Thanks in advance for any advice [[wysiwyg_imageupload:1277:]]

Sep 24, 2012

Variance In Dates between Primavera & PERT master Risk Analysis

Forum Topic

Hi All, I recently loaded my schedule XER in to PRA software to do a risk simulation.But before making any changes i found that the dates are moved to the right side without making any simulation.Anybody faced kind of situation while working in PRA. ...

Sep 24, 2012

Material Resources Assignment in P6

Forum Topic

Dear All, I want to assign material quantities to a constuction plan in P6,Like, Excavation (xx m3)Concreting (xx m3)Structure Erection (xx Tons)etc... etc... Currently I am assigning a Material Resource in Resources. I have made a resource "concreti...

Sep 24, 2012

Super Summary Method of Delay Analysis

Forum Topic

 Hi Planners I introduce a new method of delay analysis for your consideration. 1.         Super Summary Method of Analysis 1.1       Baseline Programme 1.1.1           The Super Summary method of delay analysis is used when the baseline programme us...

Oct 14, 2012

Reschedule

Forum Topic

Hi everyone.Well i come here to do the follow question.what is the real theory of reschedule?...well i apologize if my question is take it but someone like a dumb question, but i need the answer for an expert to take a choice in my work, but the foll...

Oct 14, 2012

Primavera P6 Software Development KIt (SDK)

Forum Topic

Hello All; I have installed Pruimavera P6 Version 8.2 Standalone on my laptop & Configured the database. Then I Run the setup again and chose "change" After this i selectd The "Software development kit installation" Then I Configured the database aga...

Oct 15, 2012

Print

Forum Topic

 I know that this is very simple to solve, but I am unable to find a solution.When I create a new project, and go to print, the print button is faded out, and I cannot print. What I can do, is copy the project to another project and print that way. I...

Oct 16, 2012

Critical Chain Project Management

Forum Topic

i would like to understand the difference between CCPM and conventionall critical path management. those who have applied CCPM in your project may pls share their experience. if want to switch from CPM to CCPM, where should i start and what are the t...

Oct 16, 2012

P6 server based

Forum Topic

Time Impact Analysis needs sub-network or fragnets to be attached to a main schedule can it be done so in P6 webbased.I can not see an Fragnet in the P6 that we access on our server.Please let me know how to use fragnet concepts.

Oct 16, 2012

Earned Value in P6

Forum Topic

Hi All, Can anybody tell me what columns I should show when using EV in P6 Do i use planned cost or cum planned value cost? I did think they was the same thing! But when exporting this data into an excel s curve chart my cum planned value is almost d...

Oct 17, 2012

PlanningEngineers.org

Forum Topic

Hi, Is anyone else a member of the "http://www.planningengineers.org"?  Looks like something that may be of interest to me, but no little about it...is it worthwhile? Regards, Kev

Oct 17, 2012

Changing data date P6 R7

Forum Topic

Dear planners;Is there  any tool on P6.7 to update data date and keeping  the activities dates between the old and new data date as actual dates? Regards.

Oct 18, 2012

Old lesson in P3 resource graph needed

Forum Topic

Hello I've not posted on here in years. I have recently reverted to using P3 again after a long spell of using P6.I am using a resourced schedule which has the resource on the cost, the cost also has a price per unit entered onto each resource.Giving...

Oct 19, 2012

dumb GUI question - 2007

Forum Topic

is there a way to always have the Task Information showing? kind of like how it works in P6 with an adjustable bar to show more of the chart above? i've been looking and clicking and nothing seems to work. tried Google, nothing. thanks in advance,CAM

Oct 20, 2012

nm

Forum Topic

nevermind

Oct 20, 2012