Planning/Scheduling Procedure required
Forum TopicDear All, I need Planning/Scheduling procedures related to Civil Engineering projects. Please send on my email: [email protected] Thanks & Regards, Mukesh Kumar
Dear All, I need Planning/Scheduling procedures related to Civil Engineering projects. Please send on my email: [email protected] Thanks & Regards, Mukesh Kumar
Dear All,I am trying to configure a second database for the Primavera P6 version 7 installed with an Oracle Database in my laptop running windows 8.I have Installed SQL Server 2008 R2 with SP2.Now I go to the P6-7 Client Installation CD and run the d...
Hi Planners.Greetings!Can any one pls. explin the difference between "Retained logic" / Progressive Over ride / Actual dates scheduling. I came across these terms while scheduling in P6 and could n't find the difference while scheduling the Project.T...
Hello, I am working in a P6 v8.1 schedule with multiple users. I noticed some Actual dates that looked a little suspicious to me in my portion of the schedule, so I put up the 'Last Modified By' column to see who the last person was to modify it. I...
I have encounter below case. Kindly advice. The scope of work is the roof trellis at lvl 35. 3 person involved: Main Con Sub Con (Trellis Specialist) Architect Scenario 1) Main Con issue the structural and architectural layout drawing at level 35 l...
Hudson , Emden and Eichleay Formulae Which one is more suitable for EOT claims for loss and expense ? Other than the formulae , are there any other method to calculate, like based on actual ? I heard Pro-rata prelim claim is not a recognised concept ...
OS: Windows 7 32-bit Microsoft Office 2013 (15.0.4505.1000)I have been having all sorts of formatting issues with MSP 2013,the ones that i have not been able to find any solutions for so far below:1: in print preview and when printing , in the sheet...
I have a stacked columns/ stacked lines graph for my estimated cost. i need to get the total sum label on the stacked column. is there a way to get the sum to show at the top of my columns rather than the value of the segment of column? I don't wan...
I'm trying to print multiple reports together, is there any way i can setup the print page setup ( headers and footers ) so that i don't have to set it up for each report? another issue i'm having is also say i set a print page setup( header and foo...
New Project Management Crossword (free download with no registration) http://ow.ly/kwpzB
Hi All,Does anyone has any user guide for unifier and udesigner other than oracle one?
All, In case you haven't seen them in the wiki section, please follow the below link to the updated forum posting rules. -It's important that everyone understands them. Headline points: 1) The Dos & Don'ts are broadly similar to before, though mo...
Hi - does anyone know of any JIRA interfaces that allow for JIRA data to be pulled into PM6 in real time?
I made programme and added the mandatory finish to last activity. Each activity in the programme link to each other I updated the programme with BL finish showing 31st Aug13 and Finish column showing 10th Jan'14. Still I unable to get the total float...
Although I do not find much value in the modeling of negative float it is frequently a requirement on our schedule specifications. Therefore I am looking for the best way to do so. At the moment I am using a comparison schedule similar to current sch...
When I calculate my schedule I get this message:“You have opened the current project(s) in Shared mode. Other users currently have the project(s) open as well. Performing this process may overwrite the changes made by others. Are you sure that you ...
Here's an in-depth article on tuning the Primavera P6 Background Jobs http://ow.ly/kBkHC
Hi,Im trying to convert a large programme from P6 to MP 2010. The Programme has over 3000 activities. Anyone shed any light on the quickest way to convert the programme? Thanks
Dear All,Our Contact is a Item rate Contract.Scope includes Structure ,Finishing & MEP.Preliminaries cost is provided in the contract only for structures which is 5% of Structure Contract Value.Now we made a claim for preliminaries for MEP & Finishi...
Hi,Im trying to convert a large programme from P6 to MP 2010. The Programme has over 3000 activities. Anyone shed any light on the quickest way to convert the programme? Thanks