Search

Waterproofing

Wiki Page

Task / DescriptionSlow  Ave  Fast   Units Asphalt coatings, horizontal surfaces3.5 4.2 5.8  m2/hr Asphalt coatings, vertical surfaces1.2 1.7 2.2  m2/hr Bituminous Brushed application, 2 coats4.8 5.0 6.3  m2/hr Bituminous Brushed application, 3 coats3...

Jul 14, 2011

Trackwork

Wiki Page

Trackwork...Task / DescriptionSlow  Ave  Fast   Units FST Floating Track Slab, side restraints9.6 -  -   m/day FST Floating Track Slab, resin pads10.2 -  -   m/day FST Floating Track Slab, slab units10.6 -  -   m/day PCBT - Pre-cast Concrete Block Tr...

Jul 14, 2011

Tower Cranes

Wiki Page

Tower Cranes...Task / DescriptionSlow  Ave  Fast   Units Erect and Setup 50m gib-  11.0 7.5  days Dismantle 50m gib-  10.0 -   days Lifting, Reinforcement Bins and Cages, 1st 15m lift-  3.2 -   mins/lift Lifting, Reinforcement Bins and Cages, above 1...

Jul 14, 2011

Resource and Cost Planning Steps

Forum Topic

To All:hello people. i am just registered to this awesome site. maybe it's been discussed here many times but pardon me i'm just new to this site.will somebody guide me how to have steps on resource and cost allocation? or where i will go from here?t...

Jul 14, 2011

Steel Strutting

Wiki Page

Steel Strutting...Task / DescriptionSlow  Ave  Fast   Units Horizontal heavy duty strutting-  2.0 -   days/no Diagonal heavy duty strutting-  6.0 -   days/no

Jul 14, 2011

Soil Mix Walls

Wiki Page

Soil Mix Walls...Task / DescriptionSlow  Ave  Fast   Units Three Auger Drill, cement and cure3.8 4.5 6.4  m/day

Jul 14, 2011

Sheeted Roofs

Wiki Page

Sheeted RoofsTask / DescriptionSlow  Ave  Fast   Units PVC Sheeted Roofs, large areas-  50.0 -   m2/day PVC Sheeted Roofs, small areas-  40.0 -   m2/day Plastic Profiled Sheet Systems-  54.0 -   m2/day

Jul 14, 2011

Secant Piling

Wiki Page

Secant Piling...Task / DescriptionSlow  Ave  Fast   Units Construct 30m dia cofferdam, 255 piles/concrete base-  12.0 -   wks

Jul 14, 2011

Rule of Thumb

Wiki Page

Rule of ThumbTask / DescriptionSlow  Ave  Fast   Units Site Investigation Pre Drilling5.0 4.0 3.0  days/no Ground Excavation, Hydraulic Backhoe-  50.0 -   m3/day Bored Piling, 25-70m deep10.0 8.0 6.0  days/no Formwork Fixing-  12.0 -   m2/day Reinfor...

Jul 14, 2011

Restoration Works

Wiki Page

Restoration WorksTask / DescriptionSlow  Ave  Fast   Units Façade Cleaning, Water Jetting-  25.0 -   m2/day Façade Cleaning, Acid Etching-  9.0 -   m2/day Façade Cleaning, Grit Blasting-  12.0 -   m2/day Cladding Restoration, Brickwork-  6.5 -   m2/d...

Jul 14, 2011

Rendering

Wiki Page

RenderingTask / DescriptionSlow  Ave  Fast   Units Large Wall Areas, applied in 2 coats-  2.2 2.7  m2/hr Small Wall Areas, applied in 2 coats-  1.5 1.7  m2/hr Narrow Widths, applied in 2 coats-  1.2 1.4  m2/hr Columns and Beams, applied in 2 coats-  ...

Jul 14, 2011

Reinforcement Ratios

Wiki Page

Reinforcement RatiosTask / DescriptionSlow  Ave  Fast   Units Pile Cap, Concrete m3 x Ratio = Rebar Tonnes-  14.8 -   % ratio Base Slab, Concrete m3 x Ratio = Rebar Tonnes-  13.2 14.1  % ratio Suspended Slab, Concrete m3 x Ratio = Rebar Tonnes-  20.6...

Jul 14, 2011

Transportation Power Supply

Wiki Page

Power SupplyTask / DescriptionSlow  Ave  Fast   Units AC Install 2 no Service transformers, 6 men-  12.0 -   days AC Install 2 no Switchgear, 7 men-  12.0 -   days AC Install Associated Trays and ladders, 3 men11.0 5.0 -   days AC Cable Terminations ...

Jul 14, 2011

Plasterboard

Wiki Page

PlasterboardTask / DescriptionSlow  Ave  Fast   Units Boarding to Plaster dabs3.6 4.0 5.5  m2/hr Boarding to Stud-work/Metal Lathes4.0 5.0 6.7  m2/hr Boarding 12mm nailed to studding-  12.5 -   m2/hr Boarding 19mm nailed to studding-  16.5 -   m2/hr ...

Jul 14, 2011

Partitioning

Wiki Page

PartitioningTask / DescriptionSlow  Ave  Fast   Units Timber Studding5.9 6.2 6.8  m/hr Metalwork System (MF) Studding1.6 2.0 2.5  m2/hr Tape, Joint Sand and Top Coat Plasterboard1.1 1.5 2.1  m2/hr Skimming to Plasterboards5.5 6.1 6.7  m2/hr 5mm Hardb...

Jul 14, 2011

Drainage, Manholes and Gulleys

Wiki Page

Manholes and GulleysTask / DescriptionSlow  Ave  Fast   Units Concrete Pre-Cast Manhole Units, 610 x 455 x 51 mm-  1.2 -   hrs/no Concrete Pre-Cast Manhole Units, 990 x 610 x 64 mm-  1.6 -   hrs/no Brickwork Manhole, 1.0 brick engineering-  0.3 -   m...

Jul 14, 2011

Light Rail Transit

Forum Topic

can anybody please send me a typical programme? (Primavera) maybe for overhead rail works or cut & fill tunnel or tunnel boring or stations Many thanks Stewart Green [email protected]

Jul 14, 2011

Kerbs & Paving

Wiki Page

Kerbs & PavingTask / DescriptionSlow  Ave  Fast   Units Concrete Slabs, laid on bedding, to slight falls2.7 -  4.2  m2/hr Concrete Slabs, laid on bedding, to steep falls2.3 -  2.7  m2/hr Concrete Slabs, laid in mortar, to slight falls1.5 -  2.3  m2/h...

Jul 15, 2011

Formwork

Wiki Page

FormworkTask / DescriptionSlow  Ave  Fast   Units Pilecaps, < 0.7m20.9 1.6 2.0  m2/hr Pilecaps, 0.7-2.5m21.6 2.0 2.3  m2/hr Pilecaps, 2.5-3.0m22.0 2.3 2.5  m2/hr Pilecaps, > 3.0m22.3 2.5 3.1  m2/hr Ground Beams, < 0.7m21.1 1.7 1.8  m2/hr Ground Beams...

Jul 15, 2011