(Rates per coat unless stated otherwise)   One coat primer, before fixing generally 6.70 m2/hr One coat primer, before fixing lengths 20.0 m/hr Knot, 1 primer, stop, 1 undercoat, 1 gloss 1.75 m2/hr Touchup primer, 1 undercoat, 1 coat gloss 3.10 m2/hr...

Jul 13, 2009

Walls

Wiki Page
Jul 13, 2009

Internally

Wiki Page

2 coats emulsion - to plaster 8.00 m2/hr - to brick/blockwork 6.00 m2/hr 1 mist, 2 emulsion - to plaster 6.00 m2/hr - to brick/blockwork 4.50 m2/hr 1 primer, 1 undercoat, 1 gloss - to plaster 2.30 m2/hr Undercoat - to door frame 20.00 m/hr Gloss - to...

Jul 13, 2009

Externally

Wiki Page

2 coats sandtex etc - to render/concrete 2.50 m2/hr - to brick/blockwork 2.00 m2/hr 1 sealer, 2 emulsion - to render/concrete 2.00 m2/hr - to brick/blockwork 1.70 m2/hr

Jul 13, 2009

Floors

Wiki Page

Epoxy floor paint 2.95 m2/hr

Jul 13, 2009

Ceilings

Wiki Page

Emulsion paint - 2 coat 6.05 m2/hr - 3 coats 5.02 m2/hr Textured paint 4.20 m2/hr Artex 4.10 m2/hr

Jul 13, 2009

Import from Excel to P6. P6 not recognize some fields

Forum Topic

HelloI have trouble importing data from excel to P6. I do an export to excel with the fields that interest me to generate a template, I don't do any change in the column headers and I only change the exported data with new data to import, but P6 does...

Jul 7, 2011

Querry related to P3 import to P6.V7

Forum Topic

 Hi, I have P6.V7 installed in my laptop.I need some of the templates in P3 to be opened in P6....tried the following: 1) opened P6 and selected file import2) selected Primavera Project Planner P33) Browsed the folder where P3 files are keptGot the f...

Jul 8, 2011

P6 Schedule templates for EPC projects

Forum Topic

Hi friends,I am new to Primavera P6 but have good experience EPC and Engg Project Management.Can any body send P6 Schedule templates for EPC projects? tried with available P3 file templates  but as dont have P3 installed in my m/c the import in P6 no...

Jul 8, 2011

Question about letter of intent ??

Forum Topic

Good morning to all  I have question about  letter of intent ? when I use it, and what it the different between  letter of intent and letter of accepance please advise best regards 

Jul 9, 2011

Oil and Gas Productivity Rates

Forum Topic

Hi everyone I have recently moved to oil and gas sector onshore works. Could anyone plese send me the productivity rates related to onshore oil and gas work. It would be of great help if anyone could forward thre rates to [email protected]  tha...

Jul 9, 2011

How to speed up loading data via the SDK.

Forum Topic

Greetings, I'd like to ask if anyone could suggest a way to speed up the time required for the SDK to load the selected projects' data, especially from the TASKS table. If someone knows of a way to restrict the fields that the SDK loads to just the d...

Jul 11, 2011

Delay Analysis Forensic Planning Report Writing

Forum Topic

I have worked on Claims through the years, and I just want to ask everyones opinion, regarding report writing; some companies I have worked for have written massive report documentation, supported with background data of meetings, memos, emails..etc....

Jul 11, 2011

Global Change Problem

Forum Topic

To all Primavera P6 v7 masters, I have a problem in Global Changing, specially when i choose WBS in parameters the value is not working and it states that "'' is not a valid integer value", how can i fix this problem? Please help! Thanks and regards,

Jul 12, 2011

Pipeline Construction

Wiki Page

Pipe welding is not that straight forward.  You have a number of welding passes to take into consideration, then NDT and finally hydrotesting.  I worked on a pipeline construction project in Iraq and used the following formulae to work out duration f...

Jul 12, 2011

How can I create a "Custom Work Field"

Forum Topic

I would like to implement custom fields which display a work value, for example "20 d". The fields can be either calculated (e.g. the work of a specific resource group), or entered (e.g. an initial estimate of work, which should not be entered in the...

Jul 12, 2011

Project Management and Operations Management

Forum Topic

Operations are an organizational function performing the on-going execution of activities that produce the same product or provide a repetitive service. Examples include: production operations, manufacturing operations, and accounting operations. Tho...

Jul 12, 2011

Project Management Planning and Control

Forum Topic

Organization structures:To manage a project, a company or authority has to set up a project organization, which can supply the resources for the project and service it during its life cycle.There are three main types of project organizations: Functio...

Jul 12, 2011