Search

Global change in P6

Forum Topic

I created a custom field named WF. Then I created and run 2 global changes:   1. Global change 1 (Activities): user_number6 = WF   2. Global change 2 (Activity Resource Assignment): Budgeted labor units = user_number6   I already change the security ...

Apr 16, 2011

Performance % Complete is not appearing why ?

Forum Topic

hi to all experts, before two days my Performance % complete was showing 17.25% on Grand Total Bars  but when i updated  it again it's not showing now. pls tell me solution ..... thanks,,,,,,

Apr 17, 2011

IDEAL LINK TYPE FOR SUBCONTRACTOR ACTIVITY AND CLEARANCE

Forum Topic

100 Rooms in a floor"paint works" activity starts after clearance from main contractoreach room clearance is expected in different daysThe plan is a floorwised one, having one single bar for "paint works " for a floorhow to secify the clearance in th...

Apr 17, 2011

Poblem with Performance % Complete & Schedule % Complete

Forum Topic

hi to all experts,I have problem with Performance % Complete & Schedule % Complete. as per the first picture my Performance % Complete was showing 17.92% on the data date 11-April-2011. on the 14th April 2011 i run my store period performance after t...

Apr 18, 2011

Planning Software File Formats

Forum Topic

Dear all,I have come across what looks to be programmes in a clients old electronic filing directory with .pc and .BAK formats. Does anybody know what software generates such file types?Thank you in anticipationRAY WOOD(Linx-to Project Controls Ltd)

Apr 18, 2011

Tree Clearance

Forum Topic

Hi, Does anyone have any rules of thumb for tree clearance?  I need to re-locate 1800 ish trees from one part of the desert to another.  They are currently growing in sand.  Many thanks   Simon

Apr 18, 2011

Open Link for an activity

Forum Topic

Dear All, What are the steps to check for an activty which does not have any sucessor?  With Regards, Mangesh

Apr 18, 2011

Database Connection Error

Forum Topic

Dear All,I am facing an issue with P6 Version 7. Whenever I am trying to login, it says "Unable to connect to the database.  Would you like to configure the database connection now?"It was working fine until I have changed my computer name recently. ...

Apr 18, 2011

Event code DSEV-2884-1

Forum Topic

Can any one help me! About: Primavera P6 Project ManagementRelease: 7.0.0ID#:00000092 I'm getting this code: DSEV-2884-1.Is this a layout problem?

Apr 18, 2011

Steerl Structures Schedule Model

Forum Topic

Dear All,i would like to have schedule model for steel structure or the main activities especially for plants

Apr 18, 2011

Float increasing in successor activities (P6)

Forum Topic

I am in the process of reviewing a schedule wherein the activities have large float. The first problem I am seeing is that the float is increasing in the successor activities. For example, the first few activities have 187 days of float, the next ser...

Apr 18, 2011

Primavera P6v7 to TILOS

Forum Topic

I would like to request a step-by-step guide on how to prepare data from Primavera P6v7 to be impoerted to Tilos...Thanks!

Apr 19, 2011

ENGINEERING MANAGEMENT

Forum Topic

  Physical progress for the engineering phase of a project consists of three levels of indenture as follows: Progress by drawing Progress by discipline Total engineering progress Drawing Milestones   Start draft  (20%)Layout and design completed and ...

Apr 19, 2011

Event Code PDF

Forum Topic

Hai Do anyone of us have PDF all the Event Code Error in P6 & Soultion for that Respectively or if  any know  any Event Code No & Solution for it can you post it here   Regards Anbin

Apr 19, 2011

P6 Calendar - modify work hours

Forum Topic

Hi Planners, I have an activity (let’s say its activity ‘A’) within my P6 plan that will take 6 hours to complete and has a fixed start date and time. In carrying out this task, no other activity can be progressed. I need to make this visible in the ...

Apr 20, 2011

P6 Calendar - modify work hours

Forum Topic

Hi Planners, I have an activity (let’s say its activity ‘A’) within my P6 plan that will take 6 hours to complete and has a fixed start date and time. In carrying out this task, no other activity can be progressed. I need to make this visible in the ...

Apr 20, 2011

P6 Calendar - modify work hours

Forum Topic

Hi Planners, I have an activity (let’s say its activity ‘A’) within my P6 plan that will take 6 hours to complete and has a fixed start date and time. In carrying out this task, no other activity can be progressed. I need to make this visible in the ...

Apr 20, 2011

Acvity Complete and Activity Step Complete

Forum Topic

Hello Fellow Planners,   I was wondering if the activity steps are linked to activity complete at all?   In order to clarify my question, I would like to give an example: If my activity has 3 steps (same weight assumed-> 0,33) and I check one step as...

Apr 20, 2011